Home > Library > Partnership Agreements

Public Availability of Partnership Agreement

 
The table below contains NWW water resource agreements within the preceding 10 years
(dating back to 1997) to date. The information is provided
in accordance with Water Resources Development Act (WRDA) 2007 section 2003 (g), (42 USC 1962d-5b(g)
(Blue indicates there is a file to link to for the signed agreement)
(** indicates project is currently active)

Project Cooperation Agreement (PCA) or Project Partnership Agreement (PPA) Program Year Sponsor
       
** Walla Walla River Flood Control Project Modification for the Improvement of the Environment CG 2000 Milton-Freewater Water Control District, OR
East Birch Creek Aquatic Ecosystem Restoration, Pilot Rock, Oregon CAP 2001 Oregon Department of Fish and Wildlife
** Ladd Marsh Stream Restoration CAP 2001 Oregon Department of Fish and Wildlife
Jackson Hole Restoration Project Design (PED) CG 2001 Teton County, WY
**Jackson Hole Restoration Project Construction CG 2004 Teton County and Teton Conservation District, WY
** Camp Creek Ecosystem Restoration, Zumalt Prairie CAP 2010 The Nature Conservancy
** Paradise Creek Ecosystem Restoration Amend #1 CAP 2010 University of Idaho
       
GI - General Investigation CG - Construction General
PAS - Planning Assistance to States O&M - Operation and Maintenance
Planning Division is POC for email address CAP - Continuing Authority Program
       
Feasibility Cost Share Agreements (FSCA) Program/Section Year Sponsor
       
Jackson Hole Restoration Project GI 1996 Teton County and Teton Conservation District, WY
** Walla Walla River GI 2002 Confederated Tribes of the Umatilla Indian Reservation
** Boise River GI 2009 Idaho Water Resources Board
Little Wood Channel Rehab Gooding, Idaho GI 2011 City of Gooding, Idaho
       
595 Program Agreements      
PCA and PPA design and construction assistance agreements Program Year Sponsor
       
Lagoon #2 Wastewater Treatment Plant Project Construction 595 2004 City of Horseshoe Bend, ID
Wastewater Treatment Plant Administration Building - Design and Construction 595 2004 City of Burly, ID
Amend #1   2005
Amend #2   2006
Wastewater System Improvements - Design and Construction 595 2005 City of Emmett, ID
Wastewater System Infrastructure Improvements, Surface and Groundwater Control - Design and Construction 595 2006 City of Donnelly, ID
Amend#1   2007
Wastewater Facility Plan - Design and Construction - Design 595 2006 City of Driggs, ID
** Project 2, Eastern Regional Wastewater Treatment Plant - Design 595 2006 City of Shelley, ID
Construction 2008
Wastewater Treatment Plant Upgrades Construction 595 2007 City of Rupert, ID
Eastern Interceptor in City of Ammon - Design and Construction 595 2008 City of Ammon, ID
ARRA Construction 2009
Wastewater System Development Project - Design and Construction 595 2009 City of Bliss, ID
Wastewater Treatment Plant - Design and Construction 595 2009 City of Buhl, ID
Wastewater Collection System and Treatment Plant Design and Construction 595 2009 City of Greenleaf, ID
Wastewater Treatment Plant Design 595 2009 City of Lava Hot Springs, ID
**Wastewater System Evaluation and Treatment Upgrade Design 595 2009 City of Soda Springs, ID
**Wastewater Facilities Improvement Project Design 595 2010 City of Filer, ID
**Water System Improvements Design and Construction 595 2010 City of Newdale, ID
** Water System Improvement Design 595 2010 City of New Meadows, ID
**Drinking Water System Improvement Design and Construction  595 2012 City of Arco, ID
** Phase II Wastewater Treatment Plant Improvements Design and Construction  595 2012 City of Grangeville, ID
       
Planning Assistance to States (PAS) Cost Share Agreements Program Year Sponsor
       
Flood Control - Benchmark Study/ Survey PAS 2000 Boise City, ID
Watershed Assessment for Camas Creek, OR PAS 2002 Confederated Tribes of the Umatilla Indian Reservation
Water System Supply Eval & Wetland Study PAS 2005 City of Garden City, ID
Hip Deep Creek, Hydrology Study PAS 2007 City of Richland, WA
Watershed Planning Assistance PAS 2007 City of Boise, ID
Indian Creek Trail System PAS 2008 City of Nampa, ID
Malheur Basin Water Quality Study and Carp Control Plan PAS 2010 Oregon Dept of Fish & Wildlife
Waterfront Plan PAS 2010 Port of Lewiston, WA
Weiser-Galloway Gap Analysis For Economic Evaluation & Risk-Based PAS 2010 Idaho Water Resource Board
**Lemhi River Groundwater - Surface Water Interaction Plan PAS 2010 Idaho Governor's Office of Species Conservation
**Boise River Inundation Mapping PAS 2011 Ada County, ID
** Flood Control Channel Economic Analysis PAS 2012  Mill Creek Flood Control Zone District, WA
       
Operation and Maintenance (O&M) Cost Share Agreements Program Year Sponsor
       
** Jackson Hole Levee Rehab (Operations) Amendment #1 O&M 1990 Teton County, WY
Supplement #1   1999  
Amendment enclosures   1999  
Install Safe Harbor Docks For Large Boats O&M 2003 Clearwater County , ID and Idaho Dept of Parks and Recreation
Rehab Sewage Lagoon Cell 2 At Central Ferry Park O&M 2004 Washington State Parks & Recreation Commission
Dent Acres Campground Electrical Upgrade Phase I & II O&M 2004 Idaho Dept of Parks & Recreation
Lucky Peak Dock/Swim Beach/Shelters/Buoys/Paths-Barclay Bay O&M 2006 Idaho Dept of Parks & Recreation
Little Macks RV Site Campground Improvements O&M 2006 Idaho Dept of Parks & Recreation
Chiawana Park West End Dock Replacement O&M 2006 City of Pasco, WA
Mill Creek Fish Screen O&M 2008  Walla Walla County Conservation District
Lucky Peak Fishing Access O&M 2009 Boise Project Board of Control
Dworshak Big Eddy Trail O&M 2010 State of Idaho Juvenile Correction Center
Dworshak Litter Bags O&M 2011 Orifino Chamber of Commerce