Lower Granite Juvenile Bypass System
As part of the Lower Granite Juvenile Bypass System improvements construction, the Juvenile Collection Channel inside the dam will be widened. Gatewell orifices inside the dam, through which juvenile fish travel, will also be enlarged. Both improvements will help juvenile fish migrate downstream. US Army Corps of Engineers illustration.

Download Image: Full Size (0.48 MB)
Photo by: US Army Corps of Engineers |  VIRIN: 160527-A-QP520-605.JPG