Columbia River System Operations
The U.S. Army Corps of Engineers, Bureau of Reclamation, and Bonneville Power Administration, as co-lead agencies, are preparing an environmental impact statement (EIS) in accordance with the National Environmental Policy Act on the operations, maintenance and configurations for 14 federal projects in the Columbia River System in the interior Columbia River Basin.

Download Image: Full Size (0.03 MB)
Tags:
Photo by: CRSO EIS Co-lead Agencies |  VIRIN: 160901-A-A1408-001.PNG