Report Upon the Improvement of Rivers and Harbors in
The Walla Walla, Wash., District

Extract From the Annual Report of the
Chief of Engineers, 1949

Department of the Army
Office of the Chief of Engineers
1950


[The passage below is reprinted from pages 7 and 8 of the Annual Report of the Chief of Engineers, U.S. Army, 1949]

REQUIREMENTS OF LOCAL COOPERATION FOR FLOOD-CONTROL PROJECTS

Congress in the Flood Control Act approved June 22, 1936, established, and in the amendatory and supplemental general Flood Control Acts approved August 28, 1937, June 28, 1938, August 11, 1939, August 18, 1941, December 22, 1944, July 24, 1946, June 30, 1948, and May 17, 1950, reaffirmed the general policy that flood control throughout the United States is a proper activity of the Federal Government, in cooperation with the States and local communities, and that the Federal Government should improve or participate in the improvement of navigable waters or their tributaries for flood-control purposes, if such projects are economically justified and if the lives and social security of people are otherwise adversely affected. Those acts also specified the local cooperation required for the projects authorized therein.

These requirements of local cooperation, in brief are as follows:

(a) Dam and reservoir projects authorized in any of the aforementioned flood-control or river and harbor acts are constructed entirely at the expense of the United States and are maintained and operated by the Corps of Engineers. No local cooperation is required for dam and reservoir projects unless specifically prescribed by special provisions of law.

(b) For local flood-protection projects, except channel improvement or channel rectification projects authorized by the acts of 1936, 1937, and 1938, local interests must provide without cost to the United States all lands, easements, and rights of way necessary for the construction of the projects, hold and save the United States free from damages due to the construction works, and maintain and operate all the works after completion in accordance with regulations prescribed by the Secretary of the Army. Channel improvement and channel rectification projects authorized by the acts of 1936, 1937, and 1938 are built at Federal expense, and no local cooperation is required. Exceptions to these general rules are provided by law in the case of certain specific projects.


The Walla Walla District, with headquarters at Walla Walla, Wash., was established November 1, 1948, by General Order No. 9, Office, Chief of Engineers, dated September 10, 1948. This district comprises southeastern Washington, exclusive of the watershed of the Columbia River and tributaries above and including the Yakima River, Wash.; all of Idaho, except the northern part and a small southeastern portion; a portion of western Wyoming; a small part of northwestern Utah; part of northeastern Nevada and all of eastern Oregon.

District engineer: Col. Wm. Whipple, Corps of Engineers.

Division engineer of the North Pacific Division, Portland, Oreg., comprising the Portland, Oreg., Seattle, Wash., Walla Walla, Wash., and Alaska districts: Col. Theron D. Weaver, Corps of Engineers.

Improvements

Navigation
1.
2.
3.
4.
Snake River, Oreg., Wash., and Idaho
McNary Lock and Dam, Columbia River, Oreg.
Examinations, surveys, and contingencies (general)
Plant allotment
Flood Control
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
 
16.
17.
18.
19.
Heise-Roberts area, Snake River, Idaho
Malheur improvement district, near Weiser, Snake River, Idaho
Lucky Peak Reservoir, Boise River, Idaho
Pullman, Palouse River, Wash.
Colfax, Palouse River, Wash.
Mill Creek, Wash.
Milton-Freewater, Walla Walla River, Oreg.
Dayton, Touchet River, Wash.
Pilot Rock, Birch Creek, Oreg.
Emergency flood control work under authority of Flood Control Act approved July 24, 1946
Emergency flood control work under authority of Public Laws 138 and 318, Seventy-eighth Congress; Public Law 75, Seventy-ninth Congress; and Public Laws 102 and 858, Eightieth Congress
Emergency flood control work under authority of the Flood Control Act approved Aug. 18, 1941
Snagging and clearing under authority of section 2 of the Flood Control Act approved August 28, 1937, as amended
Preliminary examinations, surveys, and contingencies for flood control
Inactive flood-control projects


1. SNAKE RIVER, OREG., WASH., AND IDAHO

Location. The Snake River, which is the largest tributary of Columbia River, rises in Yellowstone National Park, in the western part of Wyoming, flows in a general westerly direction for about 1,000 miles and empties into Columbia River near Pasco, Wash., 324 miles from the Pacific Ocean. (See U.S. Geological Survey maps of Oregon, Washington, and Idaho.)

Previous projects. No formal project for the improvement of Snake River was adopted by Congress prior to the act of June 13, 1902. Subsequent projects were adopted by River and Harbor Acts of June 13, 1902, June 25, 1910 and August 30, 1935. For further details see page 1991 of Annual Report for 1915, page 1849 of Annual Report for 1938 and page 2676 of Annual Report for 1948.

Existing Project. This provides for the construction of such dams as are necessary and open-channel improvement for purpose of providing slack water navigation and irrigation between the mouth of Snake River and Lewiston, Idaho The pool formed by McNary Dam will provide slack water from the mouth of Snake River to mile 9.7. For maintenance purposes the project also provides for any necessary work on the River between Lewiston and Johnson's Bar, Idaho, as authorized under previous projects. No channel dimensions are specified above Lewiston. A system of four dams between the mouth of the Snake River and Lewiston has been approved. The estimated total cost, revised in 1949, including the installation of three power units at each dam is as follows:

Dam 1 Ice Harbor, river mile 9.7 $89,458,000
Dam 2 Lower Monumental, river mile 44.7 81,1222,000
Dam 3 Little Goose, river mile 72.2 91,387,000
Dam 4 Lower Granite, river mile 113.1 79,506,000
Total 341,473,000

The estimated annual cost of operation and care of the four locks and dams revised in 1947 is $1,940,000.

The existing project was authorized by the River and Harbor Act approved March 2, 1945. (See H. Doc. 704, 75th Cong., 3d Sess.)

Local Cooperation. No conditions were imposed by law.

Terminal facilities. From the mouth of the Snake River to Riparia, 67 miles, there are no wharves or warehouses on the river banks. From Riparia to Lewiston, Idaho, 73 miles, there are no wharves, but there are public and privately owned warehouses and grain elevators located at Penawawa, mile 91.5, Lewiston, mile 140, Asotin, mile 146 and between Asotin and 11 miles above. Just above Lewiston, mile 140.5, there is a privately owned 40 by 60 foot wharf. On the left bank between Riparia and Lewiston there are several wheat warehouses formerly used for storage of wheat to be transferred to the railroad on the right bank.

Operations and results during fiscal year. New Work: The design of Ice Harbor Dam progressed to 23 percent of completion. Hydraulic model construction and tests were completed on the first step cofferdam. Design and field investigations were continued. Continuation of studies and design of fish handling facilities, hydraulic criteria and concrete aggregate investigation are underway. Topographic and hydrographic surveys for Dams No. 1 (Ice Harbor) and No. 2 (Lower Monumental) were complete. A letter report was issued to supplement the Site Selection Report and in lieu of detailed project plans. Detailed project plans on real estate, flowage, and relocations covering the four dams was completed and submitted to higher authority.

Maintenance: No maintenance work was accomplished during the fiscal year 1949.

Total costs $381,865.73 for the fiscal year (all new work) were as follows:

Site selection, lands, and damages (all dam sites) $50,390.49
Ice Harbor Dam (dam 1) 326,745.11
Lower Monumental Dam (dam 2) 4,730.13

Total expenditures were $302,470.20.

Condition at end of fiscal year. Construction has not been initiated at any of the four dam sites. Design on Ice Harbor Dam is 23 percent complete. Plans for dams 2, 3, and 4 are in a preliminary study condition only. Detailed plans on real estate, flowage and relocations covering the four dams have been completed and submitted to higher authority.

Total costs under the existing project have been as follows:

Description of Work New Work Maintenance
Site selection, lands and damages (all dam sites) $548,330.47  
Ice Harbor Dam (dam 1) 609,306.04  
Lower Monumental Dam (dam 2) 43,156.49  
Maintenance of channel between Lewiston and Johnson Bar   $4,218.99
Total $1,200,793.00 $4,218.99

Total expenditures have been $1,175,877.58.

Proposed operations. The funds unexpended June 30, 1949, amounting to $103,341.41, new work funds, plus an allotment received in July 1949 of $6,000 for maintenance and an allotment received in October 1949 of $225,000 for new work, a total of $334,341.41, will be applied as follows:

Accounts payable $29,082.91
New Work
Dam 1 (Ice Harbor): Continuation of planning 299,258.50
Total new work 328,341.41
Maintenance: Construction of construction works and removal of
boulders from channel above Lewiston, Idaho,
by Government plant and hired labor
6,000.00
Total All Work 334,341.41

The additional sum of $5,205,000 is needed to be appropriated for the following schedule of work for fiscal year 1951:.

New work: Dam 1 (Ice Harbor)
Continuation of advanced planning, including geologic and soils investigation,
hydraulic model studies and general and detailed design of structures
$200,000
Initiation of manufacture of turbines, generators and appurtenant items under continuing contracts 500,000
Initiation of construction by continuing contract of powerhouse, spillway and fishways 3,500,000
Initiation of railroad relocation by continuing contract 300,000
Initiation of land acquisition of damsite and reservoir 300,000
Construction of access roads and project buildings and appurtenant facilities 400,000
Total new work: 5,200,000
Maintenance:
Construction of contraction works and removal of boulders from channel above Lewiston, Idaho,
by Government plant and hired labor
5,000
Total all work: 5,205,000

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $5,000.00 $800,000.00 $5,000.00 $170,000.00 $299,218.99
Cost of new work 4,044.45 263,035.07 196,130.82 355,716.93 381,865.73
Cost of maintenance 156.29 4,062.70
Total expended 269,399.07 241,245.80 362,762.51 302,470.20
¹Does not include $85,000.00 contributed funds expended for new work on previous projects.

2. McNARY LKOCK AND DAM, COLUMBIA RIVER, OREG.

Location. The site of this project is on the Columbia River, 292 miles above the mouth, near Umatilla, Oreg., and 3 miles above the mouth of the Umatilla River.

Existing Project. This project includes a dam, power plant, navigation lock, and appurtenant facilities for purposes of navigation, power development, and incidental irrigation. The proposed improvement provides principally for the improvement of navigation, creation of pool extending approximately 64 miles upstream to a point about 27 miles above Pasco, Wash. The dam, which will raise the normal water surface approximately 85 feet to elevation 340 mean sea level, will be approximately 7,600 feet long and will consist of an earth dam at the Oregon (south) abutment, a powerhouse, a spillway dam, a navigation lock, and an earth dam at the Washington (north) abutment. Suitable facilities for migrating fish, including fish ladders, will be provided.

The powerhouse installation will comprise 14 units of 70,000 kilowatts each, making a total installed capacity of 980,000 kilowatts.

The spillway dam will be 1,310 feet long and will be located in the north channel of the river. The overflow crest at 291 feet above sea level will be surmounted by 22 spillway gates capable of releasing the design flood of 2,200,000 cubic feet per second. The deck will be at elevation 361 and will provide a service roadway and tracks for the operation of two gantry cranes.

The navigation lock will be a single type and will operate at all flows less than 800,000 cubic feet per second.

The pool created by the spillway dam will provide a navigable channel with depths of 12 feet and over, between McNary Dam and the confluence of the Yakima River, a distance of approximately 43 miles. A controlling depth of 9 feet will be provided on Snake River from its mouth to a point approximately 10.2 miles above.

All structures will be founded on a massive basalt flow that reaches a maximum thickness of 130 feet and directly overlies a sedimentary interbed. The principal data concerning the navigation lock and spillway dam are shown in the following table:

Navigation Lock
Type Single lift
Dimensions:
Net clear width of chamber
86 feet
Net clear length
675 feet
Lift (vertical):
At extreme low water and normal pool
92 feet
At mean annual flow (190,000 cubic feet per second)
84.4 feet
At average maximum flow (550,000 cubic feet per second)
72.3
Depth over miter sill at adopted low water (43,000 cubic feet per second) 12 feet
Depth over upper sill at normal pool (elevation 340) 20 feetD
Character of foundation Basalt flow
Spillway Dam
Over-all length of spillway dam section 1,310
Type of construction Concrete gravity
Elevation spillway crest 291 feet above mean sea level
Elevation deck 361 feet above mean sea level
Height, maximum (foundation to deck) 158 feet
Type of control Fixed wheel segmental lift gates
Number of gates 22
Size of gates 50 by 53 feet
Stilling basin type Concrete apron with baffles
Normal pool elevation 340 feet above mean sea level
Maximum pool elevation 356.5 feet above mean sea level
Maximum spillway capacity at normal pool elevation 1,480,000 cubic feet per second
Maximum spillway capacity at maximum pool elevation 2,200,000 cubic feet per second

The estimated cost of the dam, navigation lock, 14-power unit generating installation, fishways, and attendant buildings and grounds, revised in 1947, is $227,028,000.

The existing project was authorized by the River and Harbor Act approved March 2, 1945. (See H. Doc. 704, 75th Cong., 3d Sess.)

Operations and results during fiscal year. First step cofferdam was repaired after the severe overtopping by the June 1948 flood.

A contract was awarded for construction of the lock, 13½ bays of spillway, nonoverflow section of dam and Washington shore fish ladder, and progressed to 32 percent of completion with 200,000 cubic yards of concrete placed. Completion date is September 30, 1950.

On June 6, 1949 the Oregon shore contract was advertised. This contract includes the Oregon shore cofferdam, the powerhouse substructure for units No. 1 and No. 2 and assembly bay, the second step cofferdam and a portion oft he south abutments. Contracts were awarded for four main turbines, four main generators, two station-service turbines, two spillway gantry cranes, fish-ladder water-supply slide gates, permanent administration building, permanent maintenance building, permanent store building, 54 semi-permanent residences, and certain additions to McNary townsite utilities.

Invitations to bids have been issued for 2 station-service generators, 7 main transformers, 11 half-sections of spillway gates and 2 lock-stop log derricks.

Contract for grading for the west 5.5 miles of the Spokane, Portland & Seattle Railway relocation was completed. Contract plans and specifications for an additional 29 miles were brought to 98 percent of completion. All surveys required for the relocation were completed.

Preliminary surveys for the relocation of the Union Pacific Railroad and Northern Pacific Railway and the Oregon and Washington State Highways were completed. Final location surveys were brought to 60 percent of completion. Contract plans and specifications for the 8 miles of the Union Pacific Railroad relocation and highway relocations are 75 percent complete.

Invitation for bids has been issued for a levee at Richland, Wash.

Total costs for fiscal year were $14,336,311.20, for all new work. Expenditures were $14,112,040.70.

Condition at end of fiscal year. Construction of the existing project, which was started May 5, 1947, is now approximately 6 percent complete.

Washington shore contract is 32 percent complete. 200,000 cubic yards of concrete were placed, half in lock and half in spillway dam.

Administration building, maintenance building, and store building are essentially complete. Forty semipermanent residences are completed. Contract for 14 semipermanent residences was awarded in June 1949.

Preliminary surveys for the relocation of the Union Pacific Railroad and Northern Pacific Railway and the Oregon and Washington State Highways are complete. Final location surveys are 60 percent complete. Contract plans and specifications for the 8 miles of the Union Pacific Railroad relocation and highway relocations are 75 percent complete.

Design of powerhouse was submitted to Office, Chief of Engineers for approval on June 8, 1949.

Design of all cofferdams has been completed.

Design of Oregon shore fish ladder and for nonoverflow section between powerhouse and spillway is being prepared.

Total costs have been $21,585,595.30, all for new work. Expenditures have been $21,400,542.14.

Proposed operations. The funds unexpended June 30, 1949, in the amount of $16,174,457.86, plus an anticipated allotment of $35,000,000, a total of $51,174,457.86, will be applied to new work as follows:

Accounts payable $2,536,982.04
Engineering, hired labor 1,075,000.00
Engineering, contracts 22,842.00
Lands 3,000,000.00
Operations of facilities 491,848.00
Miscellaneous items of construction by hired labor 213,194.00
Supply contracts:
Powerhouse equipment (governing equipment, hydraulic turbines, generators, transformers, control equipment, station service switch gear, cranes, etc.)
2,245,000.00
Equipment and material for lock, spillway and fishways (sheet-steel piling, slide gates and operating machinery, gantry cranes, tainter valves and operating machinery, culvert bulkheads and trash racks, spillway gates, derricks, miter gates, and stop logs, bascule bridge, etc.)
2,913,503.00
Construction of a portion of navigation lock, abutment, fishways, spillway, dam, etc., by contract
16,999,101.00
Construction of second-step cofferdam, substructure for two main units, station-service bay and assembly bay of powerhouse and portion of Oregon shore fishways, by contract
6,000,000.00
Construction of Richland section of McNary levees, by several contracts
855,336.00
Relocation of Spokane, Portland & Seattle Ry., by several contracts
6,303,442.00
Relocation of Union Pacific R.R., and south shore highways
6,696,000.00
Construction of permanent and temporary housing and utilities, by contract
1,831,209.82
Total 51,174,457.86

An additional sum of $56,000,000 is needed to be appropriated for the following schedule of work during the fiscal 1951:

New work:
Completion of second step cofferdams and portions of powerhouse, south abutment and Oregon fish facilities
$11,200,000
Initiation of continuing contract for completion of spillway, powerhouse abutments and fish passing facilities
9,615,000
Construction of Pasco levees
2,700,000
Continue manufacture of equipment for powerhouse
3,860,000
Continue land acquisition
1,500,000
Continue relocation of Spokane, Portland & Seattle Ry. and north shore highways
11,645,000
Continue relocation of Union Pacific R.R. and south shore highways
8,390,000
Relocation of miscellaneous utilities
4,940,000
Continue ferry operation, camp maintenance, school facilities, etc.
750,000
Miter gates, spillway gates, bascule bridge, valves, cranes, derricks, miscellaneous equipment
1,400,000
Total 56,000,000

Cost and financial summary
Total amount appropriated to June 30, 1949 $37,575,000.00
Cost of new work to June 30, 1949 21,585,595.30
Total net expenditures to June 30, 1949 21,400,542.14
Unexpended balance, June 30, 1949 16,174,457.86
Unobligated balance available, June 30, 1949 2,006,103.08
Amount appropriated for fiscal year ending 1950 37,006,103.08
Estimated additional amount required to be appropriated for completion of existing project 154,453,000.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $55,000.00 $3,020,000.00 $4,500,000.00 $30,000,000.00
Cost of new work 26,687.69 410,329.50 $906,053.22 5,906,213.69 14,336,311.20
Cost of maintenance
Total expended 434,473.83 918,401.46 5,935,026.15 14,112,040.70

3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

The total cost of work during the fiscal year was $7,095.76. Expenditures were $7,430.54. The funds unexpended June 30, 1949, including accounts receivable amounting to $13,746.70, plus allotment made in July 1940 of $16,000, will be applied to features of work under this heading during the fiscal year 1950.

The additional sum of $26,000 is needed to be appropriated for the fiscal year 1951.

Total amount appropriated to June 30, 1949 $20,300.00
Cost of maintenance to June 30, 1949 7,095.76
Total net expenditures to June 30, 1949 7,430.54
Unexpended balance, June 30, 1949 12,869.46
Unobligated balance available, June 30, 1949 13,204.24
Amount appropriated for fiscal year ending June 30, 1950 16,000.00
Total unobligated balance available for fiscal year 1950 29,204.24

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $20,300.00
Cost of new work
Cost of maintenance 7,095.76
Total expended 7,430.54

4. PLANT ALLOTMENT, WALLA WALLA, WASH., DISTRICT

Cost and financial summary
Cost of new work to June 30, 1949
Total net expenditures to June 30, 1949 -$973,082.71
Unexpended balance, June 30, 1949 973,082.71
Unobligated balance available, June 30, 1949 822,330.02

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated
Total expended -$973,082.71

Status of All Investigations for Navigation Called For
By River and Harbor Acts and Committee Resolutions
Locality Authorization Act Date
Transmitted
To Congress
Document
No.
Recommendation
Clearwater, Snake, and Salmon Rivers, Oreg. and Idaho (supp. 308 report). Sec. 6, River and Harbor Act, Aug. 30, 1935.
Columbia and Snake Rivers, Oreg., Wash., and Idaho, for further improvement in the vicinity of Umatilla, Oreg. Senate Public Works Committee resolution, Jan. 28, 1947.
Salmon, Snake, and Clearwater Rivers, Oreg. and Idaho (supp. 308 report). Sec. 6, River and Harbor Act, Aug. 30, 1935.
Snake and Columbia Rivers, Oreg., Wash., and Idaho for further improvement in the vicinity of Umatilla, Oreg. Senate Public Works Committee resolution, Jan. 28, 1947.
Snake, Clearwater, and Salmon Rivers, Oreg. and Idaho (supp. 308 report). Sec. 6, River and Harbor act, Aug. 30, 1935.
Umatilla, Oreg., for further improvement of the Columbia and Snake Rivers, Oreg., Wash., and Idaho, in vicinity of. Senate Public Works Committee resolution, Jan. 28, 1947.

5. Heise-Roberts Area, Snake River, Idaho

Location. This project is located on both banks of the Snake River between the towns of Heise and Roberts in eastern portion of Idaho, approximately 20 miles northeast of Idaho Falls, Idaho.

Existing Project. This provides for channel improvement of the Snake River at selected points between Heise and Roberts, Idaho, by channel clearing, alignment changes, levee construction and bank protection works. This work is a part of a multipurpose project on the Snake River, Idaho, which also includes the construction of the Palisades Dam by the Bureau of Reclamation for operation in the combined interest of flood control, irrigation, and power.

The existing project was authorized by Flood Control Act approved December 22, 1944 (H. Doc. 452, 77th Cong., 1st sess.). The estimate of cost, made in 1948, is $1,490,000 for construction. The cost of lands and damages is to be paid by local interests.

Local Cooperation. See page 8 for requirements.

Operations and results during fiscal year. Construction was completed by contract at the following seven locations: East Belt Railroad, station L174 to station L215, downstream, to the upstream end of Lowder slough; station 700 to station 752, left bank, approximately 2 miles northwest of Lorenzo; station 269 to station 443+15, left bank, 3 miles southeast of Labelle; station 514 to station 627, left bank, 2 miles northwest of Lorenzo; station 0+00 to station 281+47, right bank, upstream from Lorenzo Bridge; station 445 to station 510, downstream from the Lorenzo right bank location.

Total costs for the fiscal year were $453,750.74, all for new work. Expenditures were $468,693.87.

Condition at end of fiscal year. Construction has been completed at 11 locations. Construction will be completed at three other locations in the fall of 1949. Preparation of plans and specifications are underway for construction at three locations. The project as a whole is 75 percent complete.

Total costs have been $1,098,598.96 for new work. Expenditures have been $1,090,291.72.

Proposed operations. The funds unexpended June 30, 1949 amounting to $59,408.28 plus the appropriation of $250,000 for fiscal year 1950, a total of $309,408.28, will be applied to new work as follows:

Accounts payable $8,307.24
Preparation of contract plans and specifications 9,500.00
Snow investigation program 5,000.00
Stockpiling stone at two locations, Lorenzo Bridge and Lowder slough 5,500.00
Raising and widening existing levee along left bank of Snake River, station 203-00 to station 420-00 omitting station 246+50 to station 278-00 14,000.00
Construction of levees and bank protection, station 39 to station 174 168,000.00
Construction of levee and bank protection, station 752 to station 934 but not inclusive 99,101.04
Total
309,408.28

Cost and financial summary
Total amount appropriated to June 30, 1949 $1,149,700.00
Cost of new work to June 30, 1949 1,098,598.96
Total net expenditures to June 30, 1949 1,090,291.72
Unexpended balance, June 30, 1949 59,408.28
Unobligated balance available, June 30, 1949 41,001.25
Amount appropriated for fiscal year ending June 30, 1950 250,000.00
Total unobligated balance available for fiscal year 1950 291,001.25

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $48,700.00 $250,000.00 $5,000.00 $351,000.00
Cost of new work 27,103.36 $78,492.06 539,252.80 453,750.74
Cost of maintenance 7,095.76
Total expended 23,423.68 78,257.70 519,916.47 468,693.87

6. Malheur Improvement District Near Weiser, Snake River, Idaho

Location. This project is located on the left bank of the Snake River in Malheur County, Oreg., 1½ miles above Weiser, Idaho.

Existing Project. This provides for protection of river bank in the Malheur improvement district along the sharp bend of the Oregon side of the river about 1½ above Weiser, Idaho. The estimate of cost for new work, made in 1948, is $37,600 for construction. The cost of lands and damages is to be paid by local interests.

The existing project was authorized by Flood Control Act approved December 22, 1944 (H. Doc. 452, 77th Cong., 1st sess.).

Local Cooperation. See page 8 for requirements.

Operations and results during fiscal year. None. Total costs and expenditures for the fiscal year were $1.

Condition at end of fiscal year. No construction work has been done, but preliminary planning and design have been completed.

Total costs and expenditures have been $319.39, all for new work.

Proposed operations. The funds unexpended June 30, 1949 amounting to $980.61 will be applied to the preparation of contract plans and specifications.

No work is scheduled for the fiscal year 1951.

Cost and financial summary
Total amount appropriated to June 30, 1949 $1,300.00
Cost of new work to June 30, 1949 319.39
Total net expenditures to June 30, 1949 319.39
Unexpended balance, June 30, 1949 980.61
Unobligated balance available, June 30, 1949 980.61
Total unobligated balance available for fiscal year 1950 980.61
Estimated additional amount required to be appropriated for completion of existing project 36,300.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $1,300.00
Cost of new work $315.43 $2.96 $1
Cost of maintenance
Total expended 315.43 2.96 1

7. Lucky Peak Reservoir, Boise River, Idaho

Location. On the Boise River in southwestern Idaho approximately 9 miles southeast of the city of Boise, and approximately 12 miles downstream from Arrowrock Reservoir.

Existing Project. The plan of improvement provides for construction of a rolled earth-fill dam approximately 250 feet high and 1,700 feet long at the crest, with a reservoir providing a total storage, at normal pool level, of 306,000 acre-feet. The spillway will be located on the left abutment and will be designed to pass 123,000 cubic feet per second at maximum pool. Its discharge will be controlled by automatically operated tainter gates. The outlet works are to be located on the left abutment and consists of a tunnel controlled by Howell-Bunger valves.

The plan contemplates the joint use of storage in Lucky Peak, Arrowrock, and Anderson Ranch Reservoirs. Operations of the dam as a flood-control facility will be by the Department of the Army under the direction of the Secretary of the Army with the understanding that complete or partial joint use of the storage in the three reservoirs may be undertaken at such time as may be agreed upon by the Secretary of the Army, Secretary of the Interior, and local interests concerned with flood control and use of irrigation water. The existing project was authorized by the Flood Control Act approved July 24, 1946. The estimated project cost revised in 1948, is $22,000,000.

Local Cooperation. Section 2 of the Flood Control Act approved June 28, 1938, applies.

Operations and results during fiscal year. Preparation of detailed project plans was continued, preliminary plans have been completed for construction of a detour road around the axis of the dam. A contract with the Bureau of Highways, State of Idaho to make field surveys for relocation of Highway No. 21 and county roads around the project is in progress. An operating plan for reservoirs on Boise River satisfactory to the Department of the Interior and the Engineers is being prepared.

Plans and specifications for the tunnel and lining progressed to 75 percent of completion.

Subsurface explorations of the dam site foundations were completed. Explorations of the abutments and piers of the proposed bridge site on Moores Creek were completed. Total costs for the fiscal year were $339,844.79, all new work. Expenditures were $383,417.65 of which $77,600 was an advance to plant.

Condition at end of fiscal year. No construction work has been done. Total costs have been $497,910.64, all new work. Expenditures have been $536,284.66 of which $77,600 was an advance to plant.

Proposed operations. The funds unexpended June 30, 1949, amounting to $243,715.34 plus $77,600 return of funds advanced to Plant and Allotments of $3,000,000.00, a total of $3,321,315.34 will be applied to new work as follows:

Accounts payable $39,225.98
Engineering hired labor 372,282.36
Engineering contracts 79,807.00
Lands 250,000.00
Construction of outlet tunnel by contract 1,345,000.00
Excavation for construction of spillway and embankment by contract 800,000.00
Relocation of roads by contract 435,000.00
Total 3,321,315.34

An additional sum of $7,900,000 is needed to be appropriated for the following schedule of work during the fiscal year 1951:

New work:
Completion of tunnel
$675,000
Continuation of construction of the dam and excavation of the spillway
3,240,000
Continue relocation of highway and county roads
3,665,000
Complete the acquisition of reservoir, lands
165,000
Site development
155,000
Total 7,900,000

Cost and financial summary
Total amount appropriated to June 30, 1949 $780,000.00
Cost of new work to June 30, 1949 497,910.64
Total net expenditures to June 30, 1949 536,284.66
Unexpended balance, June 30, 1949 243,715.34
Unobligated balance available, June 30, 1949 87,000.00
Amount appropriated for fiscal year ending June 30, 1950 3,000,000.00
Total unobligated balance available for fiscal year 1950 3,087,000.00
Estimated additional amount required to be appropriated for completion of existing project 18,220,000.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $190,000.00 $590,000.00
Cost of new work 158,065.85 339,844.79
Cost of maintenance
Total expended 152,867.01 383,417.65

8. Pullman, Palouse River, Wash.

Location. This project is located on South Fork of Palouse River at Pullman in eastern Washington.

Existing Project. This provides for flood control at Pullman, Wash., by the improvement of the channel of the South Fork of Palouse River, the construction of levees, raising existing flood and retaining wall, and revetment work.

The estimate of cost for new work, made in 1948, is $1,220,000 for construction. The cost of lands and damages is to be paid by local interests.

The existing project was authorized by the Flood Control Act approved December 22, 1944 (H. Doc. 888, 77th Cong., 2d sess.).

Local Cooperation. See page 8 for requirements. In addition to the usual requirements, local interests are required to accomplish at their own expense the street, railroad, and bridge modifications necessary for the construction of the project.

Operations and results during fiscal year. Preliminary planning and preparation of detailed project plans are underway. Total costs for the fiscal year were $12,986.89, all for new work. Expenditures were $12,984.58.

Condition at end of fiscal year. No construction work has been done, but preliminary planning is about 65 percent complete. Detailed project plans are being prepared and are scheduled to be submitted to higher authority September 1, 1949.

Total costs have been $24,432.18, all new work. Expenditures have been $24,356.51.

Proposed operations. The funds unexpended June 30, 1949, amounting to $10,643.49 will be applied to accounts payable and completion of detailed project plans.

An additional sum of $25,000 is needed to be appropriated for the fiscal year 1951 for advanced planning and contract plans and specifications.

Cost and financial summary
Total amount appropriated to June 30, 1949 $35,000.00
Cost of new work to June 30, 1949 24,432.18
Total net expenditures to June 30, 1949 24,356.51
Unexpended balance, June 30, 1949 10,643.49
Unobligated balance available, June 30, 1949 9,630.90
Total unobligated balance available for fiscal year 1950 9,630.90
Estimated additional amount required to be appropriated for completion of existing project 1,185,000.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $20,000.00; $5,000.00 $10,000.00
Cost of new work 51.60 8,334.72 $144.88 $2,914.09 12,986.89
Cost of maintenance
Total expended 47.00 8,338.72 144.88 2,840.73 12,984.58

9. Colfax, Palouse River, Wash.

Location. This project is located on the Palouse River and the South Fork of the Palouse River at and adjacent to their confluence and on Spring Flat Creek in eastern Washington.

Existing Project. This provides for flood-control works in the vicinity of and through Colfax, Wash., by channel enlargement and modification, levees, flood walls, and revetments. The estimate of cost of new work, made in 1948 is $1,880,000 for construction The cost of lands and damages is to be paid by local interests.

The existing project was authorized by the Flood Control Act approved December 22, 1944 (H. Doc. 888, 77th Cong., 2d sess.).

Local Cooperation. See page 8 for requirements. In addition to the usual requirements, local interests are required to accomplish at their own expense the street, railroad, and bridge modifications necessary for the construction of the project.

Operations and results during fiscal year. Detailed project plans were completed and submitted to higher authority.

Total costs for the fiscal year 2343 $24,113.86, all for new work. Expenditures were $24,302.47.

Condition at end of fiscal year. No construction work has been done. Detailed project plans have been submitted to higher authority.

Total costs have been $55,000. Total expenditures have been $55,000.

Proposed operations. An allotment of $25,000 received in September 1949 will be applied to the preparation of contract plans and specifications.

No work is scheduled for fiscal year 1951.

Cost and financial summary
Total amount appropriated to June 30, 1949 $55,000
Cost of new work to June 30, 1949 55,000
Total net expenditures to June 30, 1949 55,000
Amount appropriated for fiscal year ending June 30, 1950 25,000
Total unobligated balance available for fiscal year 1950 25,000
Estimated additional amount required to be appropriated for completion of existing project 1,800,000

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $25,000.00 $5,000.00 $10,000.00 $15,000.00
Cost of new work 29.20 25,129.78 $-33.41 5,760.57 24,113.86
Cost of maintenance
Total expended 24,450.32 675.25 5,571.96 24,302.47

10. Mill Creek, Wash.

Location. Near Walla Walla, Wash., on Mill Creek, a tributary of the Walla Walla River.

Existing Project. The plan of improvement provides for construction of flood-control works consisting of a storage dam, outlet works, diversion works, division structures and improvement of a stretch of Mill Creek Channel, including the reconstruction of the Otis and Merriam Street Bridges across Mill Creek in the city of Walla Walla, Wash.

The storage dam, which will form a reservoir of 6,000 acre-feet capacity, is a rolled earth fill structure 145 feet high, 3,200 feet long at the crest, and 800 feet wide at the base. Flood water is diverted storage by means of diversion work on Mill Creek consisting of a rolled earth fill dam 1,700 feet long and 20 feet high, with a concrete spillway section and headworks at the left abutment, and a concrete-lined canal leading from the headworks to the storage reservoir. Stored water is subsequently released through outlet works consisting of a steel-lined concrete conduit through the base of the storage dam and a canal 5,900 feet in length from the dam to Mill creek. The normal flow of water past the diversion works is apportioned, by means of two concrete division structures, to the three delta streams, Yellowhawk, Garrison, and Mill Creek. The project will control the entire Mill Creek drainage area of 85 square miles and care for a flood of 11,400 second-feet. The existing project was authorized by the Flood Control Act approved June 28, 1938. The Flood Control Act approved August 18, 1941, modified the project in accordance with the recommendations of the Chief of Engineers in House Document 719, Seventy-sixth Congress, third session. The estimated cost, revised in 1948, is $2,270,685 for construction and $133,215 for lands and damages, a total of $2,403,900.

Local Cooperation. For the project, except for Mill Creek through the city of Walla Walla, section 2 of the Flood Control Act approved June 28, 1938, applies. For the section of Mill Creek through the city of Walla Walla, Wash., local interests will provide without cost to the United States all lands, easements, and rights-of-way necessary for construction of the project, and hold and save the United States free from claims for damages resulting from improvement. Assurances of compliance with these requirements received from local interests were approved by the Division Engineer, March 2, 1948. Local interests have contributed $80,000 toward the cost of channel improvement through the city of Walla Walla.

Operations and results during fiscal year. New work: Paving of Mill Creek Channel through the city of Walla Walla was completed.

Maintenance: Ordinary maintenance and repairs were continued. Reservoir regulation was routine. Discharge over the spillway was normal during the whole year. Because of the construction work in Mill Creek Channel in Walla Walla, it was necessary to divert water to the storage dam on the 24th of November. Maximum flow through the intake canal to storage was 160 second-feet. Discharge of storage water was normal through Russell Creek Channel. The second storage period of water occurred on December 12 at which time the maximum intake canal flow was 200 second feet. Discharge from the storage pool was again handled as above. During the balance of the fiscal year there was no necessity for storing water. Peak discharge over the diversion dike spillway was approximately 1,700 second-feet.

Improvements and reconstruction consisting of preparation of plans and specifications for remedial measures to alleviate excessive detrimental seepage from the reservoir was brought to approximately 90 percent of completion. Field surveys and auger borings were completed. Plans and specifications for the compaction of the reservoir, grouting interior drains and new sluice gate were completed. Invitation for bids to design, furnish, install and test new sluice gate was issued June 2, 1949.

Total costs for the fiscal year were $643,108.21, of which $592,819.58 was new work and $50,288.63 for maintenance. Expenditures were $788,202.75, of which $170,000 covered an advance to Plant. In addition, $80,000 was expended from contributed funds for new work.

Condition at end of fiscal year. The construction of the dam and appurtenant works was completed in 1942. An auxiliary outlet canal from the dam to Russell Creek and the construction of additional drainage facilities at the toe of the dam were completed in 1944. Paving of the channel through the city of Walla Walla was completed in 1948. The project as a whole is approximately 94 percent complete. The remaining work required to complete the project consists of sealing the reservoir floor and additional work on the drainage system in the dam.

Total costs have been $2,249,846.97 of which $2,121,711.79 was for new work and $128,135.18 for maintenance. Expenditures were $2,412,390.17 of which $170,000 covers an advance to plant.

In addition, costs and expenditures for new work from contributed funds amounted to $80,000.

Proposed operations. The funds unexpended June 30, 1949 including accounts receivable amounting to $299,368.31 plus allotments of $18,000 for maintenance and $320,000 for new work, a total of $637,368.31 will be applied as follows:

New work:
Accounts payable
$76.06
Anticipated revocation of funds by the Chief of Engineers for funds advanced during fiscal year 1949
159,900.00
Acquisition of flowage easements below Mill Creek Dam
20,000.00
Final Audit and Inspection
2,500.00
Snow investigations/TD>
11,000.00
Government costs on contract 5701 for paving Mill Creek Channel through city of Walla Walla
420.00
Available for revocation and reallotment to other Flood Control Projects
203,262.87
Total new work 397,158.93
Maintenance:
Accounts payable
7,444.56
Operation
6,000.00
Maintenance of grounds and structures
8,000.00
Weed control
2,000.00
Reservoir operation studies
2,000.00
Plans and specifications
1,500.00
Designing, furnishing, installing and testing new Sluice gate, by contract
69,500.00
Installation of additional seepage relief wells by hired labor
20,000.00
Compacting reservoir area and plugging interior drains by hired labor
123,764.82
Total maintenance 240,209.38
Total, all work
637,368.31

An additional sum of $18,000 is needed to be appropriated for maintenance during the fiscal year 1951 consisting of operations, maintenance of grounds and structures, weed control and reservoir operation studies.

Cost and financial summary
Total amount appropriated to June 30, 1949 $2,541,694.66
Cost of new work to June 30, 1949 2,121,711.79
Cost of maintenance to June 30, 1949 128,135.18
Total net expenditures to June 30, 1949 2,412,390.17
Unexpended balance, June 30, 1949 129,304.49
Unobligated balance available, June 30, 1949 272,587.51
Amount appropriated for fiscal year ending June 30, 1950 338,000.00
Total unobligated balance available for fiscal year 1950 610,587.51

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $20,000.00 $140,500.00 $-15,000.00 $17,500.00 $810,900.00
Cost of new work 2,731.07 1,247.85 5,191.37 19,168.70 592,819.58
Cost of maintenance 10,289.85 11,216.72 11,119.68 11,922.65 50,288.63
Total expended 23,611.92 13,211.23 16,690.55 48,953.08 788,202.75

11. Milton-Freewater, Walla Walla River, Oreg.

Location. On both banks of the Walla Walla River between Joe West and McCoy Bridges in the vicinity of Freewater and Milton, Oreg., 8 miles south of Walla Walla, Wash.

Existing project. The plan of improvement provides for channel rectification and improvement of approximately 7 miles of Walla Walla River in the vicinity of the towns of Milton and Freewater, Oreg. The lower 5.3 miles, between McCoy Bridge and the Milton power plant, will be protected by levees with necessary revetment and channel improvement designed for a flood of 18,600 cubic feet per second. The upper 1.7 miles, extending from the Milton power plant upstream to Joe West Bridge, will be improved by some channel clearing and rectification. The existing project was authorized by the Flood Control Act approved August 18, 1941, House Document 719, Seventy-sixth Congress, Third Session. The estimate of cost revised in 1948 is $1,085,700 for construction and $59,600 for lands and damages to be paid by local interests. The project will provide protection for the towns of Milton and Freewater and for other lower-lying areas in the Walla Walla River Valley from Milton, Oreg., to McCoy bridge against floods with a discharge about two times as great as that of the maximum flood of record, which occurred in 1931.

Local Cooperation. See page 8 for requirements. Assurances of local cooperation have not yet been requested.

Operations and results during fiscal year. Construction of an additional culvert through levee with concrete headwalls, automatic gates, revetments and appurtenances was completed at station 198+25. Bids were opened for construction of levees and channel rectification from stations 235 to 273+47. Plans and specifications for channel rectification and construction of levees, stations 183 to 235, and asphalt bank protections, stations 183 to 273+47 are in progress. Total costs for the fiscal year were $49,542.26 for new work. Expenditures were $225,161.71.

Condition at end of fiscal year. An additional culvert through levee with concrete headwalls, automatic gates, revetments and appurtenances at station 198+25 has been completed. The remaining work required consists of the construction of a left bank levee, placing of dumped-stone revetment and installation of diversion drainage structures and asphalt bank protection between stations 183+00 and 273+47. Project is approximately 9 percent complete. Total costs have been $98,602.80 for new work. Total Expenditures were $274,104.25.

Proposed operations. The funds unexpended June 30, 1949, amounting to $279,195.75 plus an allotment of $640,000, a total of $919,195.75, will be applied to new work as follows:

Accounts payable $2,798.55
Preparation of contract plans and specifications 28,146.53
Snow investigation program 5,000.00
Construction of levee and channel improvement work by several contracts 883,250.67
Total $919,195.75

Cost and financial summary
Total amount appropriated to June 30, 1949 $375,000.00
Cost of new work to June 30, 1949 98,602.80
Total net expenditures to June 30, 1949 274,104.25
Unexpended balance, June 30, 1949 100,895.75
Unobligated balance available, June 30, 1949 229,233.56
Amount appropriated for fiscal year ending June 30, 1950 640,000.00
Total unobligated balance available for fiscal year 1950 869,233.56

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $55,000.00 $300,000.00
Cost of new work 24,418.74 $12,311.03 $2,037.50 $5,528.53 49,542.26
Cost of maintenance
Total expended 28,357.17 12,222.61 2,223.28 5,410.53 225,161.71

12. Dayton, Touchet River, Wash.

Location. On both banks of the Touchet River through the city of Dayton, 25 miles northeast of Walla Walla, Wash.

Existing Project. The plan of improvement provides for the construction of earth and gravel levees and enlargement and straightening of the channel through the city of Dayton, Wash. The project will provide protection for the city of Dayton against floods with a discharge more than 1.5 times as great as that of the maximum flood of record which occurred in 1931. The existing project was authorized by the Flood Control Act of August 18, 1941. The estimate of cost revised in 1948 is $472,000 for construction and $10,000 for lands and damages to be paid for by local interests.

Local Cooperation. See page 8 for requirements. Assurances of local cooperation have not yet been requested.

Operations and results during fiscal year. Works on plans and specifications was continued.

Total costs for the fiscal year were $141.28, all for new work. Expenditures were $145.28.

Condition at end of fiscal year. No construction work has been done. Contract plans and specifications are complete, but require extensive revision due to recent channel changes.

Total costs have been $16,063.99, all for new work. Expenditures have been $16,063.99.

Proposed operations. The funds unexpended June 30, 1949, amounting to $4,236.01, for new work will be applied to Engineering studies, explorations and revision of plans and specifications.

An additional sum of $451,700 is needed to be appropriated for the fiscal year 1951 for review of plans and specifications and completion of the project.

Cost and financial summary
Total amount appropriated to June 30, 1949 $20,300.00
Cost of new work to June 30, 1949 16,063.99
Total net expenditures to June 30, 1949 16,063.99
Unexpended balance, June 30, 1950 4,236.01
Unobligated balance available, June 30, 1949 4,236.01
Estimated additional amount required to be appropriated for completion of existing project 451,700.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $10,000.00 $5,000.00 $-700.00 $5,000.00
Cost of new work 2,495.95 12,635.52 124.75 666.49 $141.28
Cost of maintenance
Total expended 2,190.46 12,876.35 190.41 662.49 145.29

13. Pilot Rock, Birch Creek, Oreg.

Location. On East and West Birch Creeks, respectively, in Pilot Rock, 15 miles south of Pendleton, Oreg.

Existing Project. The plan of improvement provides for the following features: Removal of gravel bars, brush, and debris from the channel; elimination of abrupt turns and objectionable bends in the alinement by construction of new channels; construction of levees and sloping of banks; protection of the channel walls by rock revetment; and removal or reconstruction of existing irrigation headworks, bridges, and other structures in the path of the improvement. The improvements on East Birch Creek will begin at a point just upstream from Alder Street and extend through town to the Union Pacific Railroad depot. The improvements on West Birch Creek will begin slightly upstream from Alder Street. The project will provide protection for the city of Pilot Rock against floods of the magnitude of the flood of June 22, 1938. The existing project was authorized by the Flood Control Act approved August 18, 1941. The estimate of cost revised in 1948 is $110,000 for construction and $3,600 for lands and damages to be paid by local interests.

Local Cooperation. See page 8 for requirements. Local interests have expressed a willingness to provide the necessary cooperation.

Operations and results during fiscal year. None. There were no costs or expenditures during the fiscal year.

Condition at end of fiscal year. No construction work has been done, but plans and specifications have been completed.

Total costs and expenditures have been $3,700 all for new work.

Proposed operations. No funds are available, and no work is scheduled during fiscal years 1950 and 1951.

Cost and financial summary
Total amount appropriated to June 30, 1949 $3,700
Cost of new work to June 30, 1949 3,700
Total net expenditures to June 30, 1949 3,700
Estimated additional amount required to be appropriated for completion of existing project 106,300

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $2,500.00 $700
Cost of new work 2,371.37 $628.63 700
Cost of maintenance
Total expended 2,202.46 797.54 636 $64

14. Emergency Flood-Control Work Under Authority of the Flood Control Act Approved July 24, 1946

The Flood Control Act approved July 24, 1946, authorized the allotment of $1,000,000 per year for construction of emergency bank-protection works to prevent flood damage to highways, bridge approaches, and public works; provided, that not more than $50,000 shall be allotted for this purpose at any single locality from the appropriations for any one fiscal year.

Funds in the amount of $55,600 were allotted during the fiscal year for work under this authorization.

Operations during the fiscal year included construction of a levee including dumped-stone revetment on the Clearwater River in the city of Orofino, Idaho, and construction of dumped-stone revetment on Snake River at Heise Bridge near Ririe, Idaho. Work on plans and specifications are 90 percent completed for construction of a dumped-stone revetment on the Boise River, Broadway Bridge location, in the city of Boise, Idaho. Construction has been delayed pending construction of a levee by local interests.

Total costs during the fiscal year were $28,290.51. Expenditures were $20,179.22, all for new work.

The funds unexpended June 30, 1949, including accounts receivable, amounting to $35,420.78 will be applied to accounts payable and construction of a dumped-stone revetment on the Boise River at Broadway Bridge location. Balance will be revoked and reallotted to other flood control projects.

Cost and financial summary
Total amount appropriated to June 30, 1949 $55,600
Cost of new work to June 30, 1949 28,290.51
Total net expenditures to June 30, 1949 20,179.22
Unexpended balance, June 30, 1950 35,420.78
Unobligated balance available, June 30, 1950 27,309.49

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $55,600.00
Cost of new work 28,290.51
Cost of maintenance
Total expended 20,179.22

15. Emergency Flood-Control Work Under Authority of Public Laws 138 and 318, Seventy-Eighth Congress; Public Law 75, Seventy-Ninth Congress;

and Public Laws 102 and 858, Eightieth Congress

Because of the heavy demands for emergency-repair work to flood-control structures damaged or destroyed by the disastrous floods which occurred in the spring of 1943, 1944, and 1948, Congress, in the act approved July 12, 1943, Public Law 138, Seventy-eighth Congress, in the act approved June 5, 1945, Public Law 75, Seventy-ninth Congress, in the act approved June 23, 1947, Public Law 102, Eightieth Congress, and in act approved June 30, 1948, Public Law 858, Eightieth Congress, authorized the amounts of $10,000,000, $12,000,000, $12,000,000, $15,000,000, and $25,000,000, respectively, to be appropriated as emergency funds to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers for the repair, restoration, and strengthening of levees and other flood-control works which had been threatened or destroyed by recent floods or which may be threatened or destroyed by later floods.

In addition to funds in the amount of $984,786.58 previously allotted, funds in the amount of $651,500 were allotted during the fiscal year ending June 30, 1949, for emergency-repair work pursuant to the act approved July 12, 1943.

Operations during the fiscal year included emergency-repair work which was completed at the following locations: Boise River, Idaho at Andrews, Black, Gabica and Red Bridge downstream right bank location; Catherine Creek at Union, Oreg.; Clearwater River, Idaho at Kooskia and Stites locations; Payette River, Idaho at Conrad-Hereth, Bill Smith and John McKinney locations; Portneuf River at Pocatello, Idaho; Slate Creek below Whitebird, Idaho; Snake River, Idaho at Henry Miller and Lowder slough locations; Snake River, Jackson Hole, Wyo. at Caroline Dodge location and Walla Walla River at Milton, Oreg.

Emergency repair work is under way at the following locations: Boise River at Lee Look location; Snake River, above Henry's Fork, river mile 820-831 and Youngstrom, Hansen, Gunderson and Mattson-Craig locations and Whitebird Creek, Whitebird, Idaho.

Preliminary reconnaissance is underway for emergency work on the Grande Ronde River, near Union, Oreg.

Total costs during the fiscal year were $484,161.95. Expenditures were $142,653.89. Total costs to June 30, 1949 have been $1,418,450.26. Expenditures have been $1,085,772.71.

The funds unexpended June 30, 1949, amounting to $550,513.87, will be applied during fiscal year 1950 to accounts payable and to costs incurred on work authorized under this heading.

Cost and financial summary
Total amount appropriated to June 30, 1949 $1,636,286.58
Cost of new work to June 30, 1949 1,418,450.26
Total net expenditures to June 30, 1949 1,085,772.71
Unexpended balance June 30, 1949 550,513.87
Unobligated balance available, June 30, 1949 166,392.96
Total unobligated balance available for fiscal year 1950 166,392.96

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $360,000.00 $131,000.00 $31,000.00 $204.546.58 $651,500.00
Cost of new work
Cost of maintenance 321,851.17 175,742.68 53,654.84 157,326.27 484,161.95
Total expended 321,247.90 197,499.45 57,792.03 166,270.69 142,653.89

16. Emergency Flood-Control Work Under Authority of the Flood Control Act Approved August 18, 1941

The Flood Control Act approved August 18, 1941, as amended by the Flood Control Act of July 24, 1946, authorized the allotment from flood-control appropriations of not to exceed $2,000,000 for any one fiscal year, to be expended in rescue work or in the repair or maintenance of any flood-control work threatened or destroyed by flood.

In addition to funds in the amount of $399,253.42 previously allotted, funds in the amount of $90,000 were allotted during the fiscal year ending June 30, 1949, for emergency repair work.

Operations during the fiscal year consisted of emergency repair work at the following locations: Boise River, Idaho, upstream from Middleton Canal Headgate; Snake River, Idaho, Ball location and Lowder slough in the Heise-Roberts Area.

Total costs during the fiscal year were $71,845.89. Expenditures were $80,196.09. Total costs to June 30, 1949, have been $452,738.50; expenditures have been $452,737.70. In addition, $20,000 was expended from contributed funds at Silver Bridge, Boise River, Idaho.

The funds unexpended June 30, 1949 will be applied to accounts payable. The balance will be revoked and reallotted to other flood control projects.

Cost and financial summary
Total amount appropriated to June 30, 1949 $489,253.42
Cost of new work to June 30, 1949 452,738.50
Total net expenditures to June 30, 1949 452,737.70
Unexpended balance, June 30, 1949 36,515.72
Unobligated balance available, June 30, 1949 36,479.07
Total unobligated balance available for fiscal year 1950 36,479.07

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $35,500.00 $361,000.00 $2,953.42 $90,000.00
Cost of new work
Cost of maintenance 261.28 354,638.38 25,992.95 71,845.89
Total expended 350,510.63 22,030.98 80,196.09

17. Snagging and Clearing Under Authority of Section 2 of the Flood Control Act Approved August 28, 1937, As Amended

The Flood Control Act approved August 28, 1937, as amended by the Flood Control Acts approved August 11, 1939, August 18, 1941 and July 24, 1946, authorized the allotment of not to exceed $1,000,000 from the flood-control appropriations for any one fiscal year for the removal of accumulated snags and other debris from and the clearing and straightening of channels in navigable streams and tributaries thereof, when such work is advisable in the interest of flood control; provided that not more than $50,000 shall be allotted for this purpose for any single stream from the appropriations for any one fiscal year.

In addition to funds in the amount of $81,861.05 previously allotted, funds in the amount of $25,000 were allotted during the fiscal year for snagging and clearing in the Walla Walla district.

Operations during the fiscal year included channel snagging, clearing, and channel straightening on the Upper Snake River in the vicinity of the Lower JY ranch and the Jackson-Wilson Highway Bridge, Wyoming.

Total costs from Federal funds during the fiscal year were $29,833.90. Expenditures were $29,846.65. Total costs to June 30, 1949 have been $106,861.05. Expenditures have been $106,861.05.

There were no unexpended funds June 30, 1949.

Cost and financial summary
Total amount appropriated to June 30, 1949 $106,861.05
Cost of new work to June 30, 1949 106,861.05
Total net expenditures to June 30, 1949 106,861.05

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $50,000.00 $25,000.00
Cost of new work 45,106.10 29,833.90
Cost of maintenance
Total expended 45,153.35 29,846.65

18. Preliminary Examinations, Surveys, and Contingencies for Flood Control

Total cost of work during the fiscal year was $55,007.52. Expenditures were $44,742.25. The unexpended funds June 30, 1949, in the amount of $41,415.94, plus an allotment received in July 1949 of $100,000, a total of $141,415.94, will be applied to accounts payable and as needed during the fiscal year 1950 for payment of expenses to be incurred under this heading.

The additional sum of $322,487 can be profitably expended during fiscal year 1951.

Cost and financial summary
Total amount appropriated to June 30, 1949 $245,926.40
Cost of maintenance to June 30, 1949 214,783.92
Total net expenditures to June 30, 1949 204,510.46
Unexpended balance, June 30, 1949 41,415.94
Unobligated balance available, June 30, 1949 31,142.48
Amount appropriated for fiscal year ending June 30, 1950 100,000.00
Total unobligated balance available for fiscal year 1950 131,142.48
Estimated additional amount required to be appropriated for completion of existing project 322,487.00

  Fiscal year ending June 30—
1945 1946 1947 1948 1949
Appropriated $18,855.44 $16,354.72 $35,659.40 $18,481.33 $86,158.19
Cost of new work
Cost of maintenance 18,855.44 16,354.72 35,659.40 18,481.33 55,007.52
Total expended 18,855.44 16,354.72 35,659.40 18,481.33 44,742.25

19. Inactive Flood-Control Projects

Name of project For last full Report see Annual Report for— Cost and expenditures to June 30, 1949 Estimated amount required to Complete
New work Maintenance
Pendleton, Umatilla River, Oreg. 1939 $143,262.83 (1)
(1) Completed

Status of all investigations for flood control called for by flood control acts and committee resolutions
Locality Authorization act Date transmitted to Congress Document No. Recommendation
Big Wood River and tributaries, Blaine County, Idaho, Snake River and tributaries, with a view of flood protection on. Senate Public Works Committee resolution, Apr. 20, 1948.      
Boise River, Idaho Commerce Committee resolution,
Oct. 12, 1943
     
Boise River, Idaho, to provide flood protection along Dry Creek, Idaho. Senate Public Works Committee resolution, Mar. 4, 1947.      
Boise River and tributaries, Idaho, flood control Flood Control Committee resolution, Nov. 10, 1943.      
Cascade storage project, Payette River, Idaho. Flood Control Act, Mar. 4, 1937.      
Clearwater River, (Snake, Clearwater and Salmon Rivers), Oreg., and Idaho (supp.308) Sec. 6, River and Harbor Act, Aug. 30, 1935.      
Columbia River and tributaries, review of 308 report. Commerce Committee resolution, Sept. 24, 1943.      
Dry Creek, Boise River, Idaho, to provide flood protection. Senate Public Works Committee resolution, Mar. 4, 1947.      
Grande Ronde River and tributaries, Oreg. Flood Control Act, Aug. 28, 1937.      
Grande Ronde River and tributaries, Oreg. Flood Control Act, Mar. 4, 1937.      
Do.
Flood Control Act, June 13, 1934.      
Heise-Roberts Area, Idaho, Snake River, Idaho. Commerce Committee resolution, Sept. 24, 1943.      
Marsh Creek, and along Portneuf River, Idaho, in the Pocatello area, Snake River Basin, for flood protection. Flood Control Committee resolution, July 23, 1946.      
Marsh Creek and Portneuf River, Idaho, in the Pocatello area, Snake River Basin, for flood protection. Commerce Committee resolution, July 27, 1946.      
Mill Creek, Wash. for flood protection, at Walla Walla, Wash. Commerce Committee resolution, Mar. 5, 1946.      
Payette River, Idaho Flood Control Act, Mar. 4, 1937.      
Payette River, Idaho, Cascade storage project. Flood Control Act, Mar. 4, 1937.      
Pocatello Area, Portneuf River, and along Marsh Creek, Idaho, Snake River Basin for flood protection. Flood Control Committee resolution, July 23, 1946.      
Do.
Commerce Committee resolution, July 27, 1946.      
Portneuf River in the Pocatello area, and along Marsh Creek, Idaho, Snake River Basin for flood protection. Flood Control Committee resolution, July 23, 1946.      
Do.
Commerce Committee resolution, July 27, 1946.      
Powder River and tributaries, Oreg. Flood control Act, Aug. 28, 1937.      
Powder River, Oreg. Flood Control Act, Mar. 4, 1937.      
Salmon River, Oreg., Snake, Clearwater and Salmon Rivers, Oreg., and Idaho (supp. 308) Sec. 6, River and Harbor Act, Aug. 30, 1935.      
Snake River and tributaries, with a view to flood protection on Big Wood River and tributaries, Blaine County, Idaho. Senate Public Works Committee resolution, Apr. 20, 1948.      
Snake River Basin, Heise-Roberts area, Idaho. Commerce Committee resolution, Sept. 24, 1943.      
Snake River Basin, (partial report on Columbia River and tributaries) Commerce Committee resolution, Sept. 24, 1943.      
Snake River Basin, for flood protection along Portneuf River, Idaho, in the Pocatello area, and along Marsh Creek, Idaho. Flood Control Committee resolution, July 23, 1946.      
Snake River Basin, for flood protection along Portneuf River, Idaho, in the Pocatello area, and along Marsh Creek, Idaho. Commerce Committee resolution, July 27, 1946.      
Snake River and tributaries, Wyoming, flood control and bank erosion, protection in vicinity of Wilson, Wyo. Flood Control Committee resolution, Nov. 10, 1943.      
Snake, Clearwater and Salmon Rivers, Oreg., and Idaho (supp. 308). Sec. 6, River and Harbor Act, Aug. 30, 1935.      
Touchet River, Wash. Senate Public Works Committee resolution, Apr. 15, 1949.      
Umatilla River, Oreg. Commerce Committee resolution, Mar. 23, 1939.      
Walla Walla, Mill Creek, Wash., for flood protection of. Commerce Committee resolution, Mar. 5, 1946.      
Weiser River, Idaho Flood Control Act, Mar. 4, 1937.      
Wilson, Snake River and tributaries Wyoming, flood control and bank erosion protection in vicinity of. Flood Control Committee resolution, Nov. 10, 1943.      


Return to the Civil Works Activities Page