Extract From the Annual Report of the
Chief
of Engineers, 1962
Department of the Army
Office of the Chief of Engineers
1962
Improvements
Navigation
| 24. 25. 26. |
Surveys Collection and study of basic data Research and development |
NAVIGATION
1. SNAKE RIVER, OREG., WASH., AND IDAHO
| Project | New Work | Maintenance | Total |
|---|---|---|---|
| Prior to June 13, 1902 | $153,410.26 | $15,089.74 | $168,500.00 |
| 1902 to Act of March 2, 1945 | 246,739.54¹ | 171,480.34 | 418,219.88¹ |
| Totals | 400,149.80 | 186,570.08 | 586,719.88 |
| 1In addition, $85,000 for new work expended from contributed funds. | |||
| Item | Estimated cost (July 1961 Base) |
|---|---|
| Lower Granite Lock and Dam, river mile 107.5 | $151,000,000 |
| Little Goose Lock and Dam, river mile 72.2 | 146,000,000 |
| Lower Monumental Lock and Dam, river mile 44.7 | 162,000,000 |
| Ice Harbor Lock and Dam, river mile 9.7 | $123,000,000 |
| Open-river improvement, Lewiston to Johnson Bar Landing¹ | 34,613 |
| Total | $582,734,613 |
| No channel dimensions specified, maintenance only. | |
| Project | Approved 1962 Estimated Cost |
Total new work appropriations to June 30, 1962 |
Cost to June 30, 1962 | Percent completed |
Construction data | |
|---|---|---|---|---|---|---|
| New work | Maintenance | |||||
| Lower Granite Lock and Dam¹ | $151,000,000² | $715,823 | $585,969 | |||
| Little Goose Lock and Dam¹ | 146,000,000² | 1,875,100 | 1,708,466 | |||
| Lower Monumental Lock and Dam | 162,000,000 | 12,485,000 | 11,386,569 | 7 | Construction begun in June 1961. | |
| Ice Harbor Lock and Dam¹ | 123,700,000 | 122,637,173 | 121,895,220 | $148,877 | 99 | Construction begun in January 1956. |
| Survey for Navigation Aids | | | | $3,394 | ||
| Open River improvementLewiston to Johnson Bar landing ³ | 34,613 | 34,613 | 34,613 | 67,921 | | Maintenance only |
| Total | $582,734,613 | $137,747,709 | $135,610,838 | $220,192 | ||
|
1See individual report. 2Pro rata cost of site selection studies, preauthorization studies, and advance engineering. 3No channel dimension specified. | ||||||
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $26,473,000 | $19,683,000 | $30,502,000 | $27,995,923 | $19,415,000 | $138,147,859¹ | |
| 26,399,063 | 19,361,853 | 29,104,279 | 29,270,049 | 18,126,906 | 136,010,988¹ | |
| Maintenance | ||||||
| 2,294 | 38,800 | 4,050 | 2,900 | 150,000 | 407,891² | |
| 2,294 | 25,166 | 9,584 | 2,894 | 148,877 | 406,762² | |
| Other new work data: | ||||||
| $890,668 | ||||||
| 19,962,827 | ||||||
| 20,853,495 | ||||||
| 425,024,077 | ||||||
|
1Includes $400,150 for new work and $370,000 preauthorization studies. Does not include contributed funds for new work consisting of $85,000 on previous projects, and $82,500 for artificial spawning channel. 2Includes $186,570 for maintenance on previous projects. | ||||||
2. LOWER GRANITE LOCK AND DAM, SNAKE RIVER, WASH.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | | $17,100 | $4,077 | $500,000 | $715,823¹ | |
| $4,516; | $3,447 | 2,466 | 326 | 370,146 | 585,969¹ | |
| Other new work data: | ||||||
| $78,608 | ||||||
| 500,000 | ||||||
| 578,608 | ||||||
| 149,784,177 | ||||||
| 1Includes $75,000 preauthorization studies. | ||||||
3. LITTLE GOOSE LOCK AND DAM, SNAKE RIVER, WASH.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | | $390,100 | $550,000 | $715,000 | $1,875,100¹ | |
| $7,027 | $2,665 | 314,528 | 549,765 | 624,480 | 1,708,466¹ | |
| Other new work data: | ||||||
| $146,035 | ||||||
| 1,600,000 | ||||||
| 1,746,035 | ||||||
| 142,524,900 | ||||||
| 1Includes $70,000 preauthorization studies. | ||||||
4. LOWER MONUMENTAL LOCK AND DAM, SNAKE RIVER, WASH.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $500,000 | $550,000 | $830,000 | $1,150,000 | $9,200,000 | $12,485,000¹ | |
| 463,203 | 542,816 | 814,388 | 1,164,725 | 8,146,438 | 11,386,569¹ | |
| Other new work data: | ||||||
| $579,678 | ||||||
| 16,800,000 | ||||||
| 17,379,678 | ||||||
| 132,715,000 | ||||||
| 1Includes $75,000 preauthorization studies. | ||||||
5. ICE HARBOR LOCK AND DAM, SNAKE RIVER, WASH.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $25,973,000; | $19,133,000 | $29,299,000 | $26,300,000 | $9,000,000 | $122,637,173¹ | |
| 25,924,317 | 18,812,945 | 27,977,829 | 27,555,232 | 8,985,842 | 121,895,220¹ | |
| Maintenance | ||||||
| | | | | 150,000 | 150,000 | |
| | | | | 148,877 | 148,877 | |
| Other new work data: | ||||||
| $86,346 | ||||||
| 1,062,827 | ||||||
| 1,149,173 | ||||||
| 1Includes $150,000 preauthorization studies. Does not include $82,500 contributed funds for artificial spawning channel. | ||||||
6. McNARY LOCK AND DAM, COLUMBIA RIVER, OREG.
| Navigation Lock | |
|---|---|
| Type | Single lift |
| Dimensions: | |
| 86 feet | |
| 675 feet | |
| Lift (vertical): | |
| 92 feet | |
| 84.4 feet | |
| 72.3 feet | |
| Depth over miter sill at adopted low water (43,000 cubic feet per second) | 12 feet |
| Depth over upper sill at normal pool (elevation 340) | 20 feet |
| Character of foundation | Basalt flow |
| Spillway Dam | |
| Over-all length of spillway dam section | 1,310 feet |
| Type of construction | Concrete gravity |
| Elevation spillway crest | 291 feet above mean sea level |
| Elevation deck | 361 feet above mean sea level |
| Height, maximum (foundation to deck) | 158 feet |
| Type of control | Fixed wheel segmental lift gates |
| Number of gates | 22 |
| Size of gates | 50 by 53 feet |
| Stilling basin type | Concrete apron with baffles |
| Normal pool elevation | 340 feet above mean sea level |
| Maximum pool elevation | 356.5 feet above mean sea level |
| Maximum spillway capacity at normal pool elevation | 1,480,000 cubic feet per second |
| Maximum spillway capacity at maximum pool elevation | 2,200,000 cubic feet per second |
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $740,000 | $500,000 | $1,144,000 | $12,500 | $9,176 | $236,477, 922¹ ² | |
| 1,243,799 | 638,759 | 674,504 | 403,239 | 20,297 | 286,278,679¹ | |
| Maintenance | ||||||
| 1,735,000 | 1,645,700 | 1,657,770 | 1,810,700 | 1,710,000 | 12,501,670 | |
| 1,715,302 | 1,643,934 | 1,652,116 | 1,794,657 | 1,700,449 | 12,423,421 | |
| Other new work data: | ||||||
| $199,243 | ||||||
| 35,000 | ||||||
| 234,243 | ||||||
| 7,812,078 | ||||||
| ¹Includes $185,000 donated funds and $347,246
preauthorization studies. ²Includes $46,676 allotted under Code 710, recreation facilities on completed project. | ||||||
7. JOHN DAY LOCK AND DAM, COLUMBIA RIVER, WASH. AND OREG.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $916,000 | $7,554,000 | $14,335,000 | $30,900,000 | $20,400,000 | $76,480,000¹ | |
| 845,302 | 7,092,655 | 14,718,821 | 28,743,044 | 20,378,953 | 74,068,439¹ | |
| Other new work data: | ||||||
| $1,940,338 | ||||||
| 39,000,000 | ||||||
| 40,940,338 | ||||||
| 294,520,000 | ||||||
| ¹Includes $350,000 preauthorization studies. | ||||||
8. COLUMBIA RIVER AND TRIBUTARIES ABOVE CELILO FALLS TO KENNEWICK, WASH.
| Acts | Work authorized | Documents¹ |
|---|---|---|
| Apr. 8, 1935 | Emergency Relief Appropriation Act authorized the existing project as an Emergency Relief project. | Rivers and Harbors, Committee Doc. 16, 73d Cong., 2d sess. |
| Aug. 30, 1935 | Adopted existing project as a river and harbor project. | Do. |
| Mar. 2, 1945 | Arlington approach channel | S. Doc. 28, 76th Cong., 1st sess. |
| Mar. 2, 1945 | Kennewick approach channel | H. Doc. 324, 77th Cong., 1st sess.² |
| 1Contains latest published map. 2Construction of McNary Dam has obviated the necessity for this work. |
||
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | | | | | $1,851,195¹ | |
| | | | | | 1,851,195 | |
| Maintenance | ||||||
| $26,973 | $4,700 | $4,950 | $5,100 | $26,500 | 1,004,236² | |
| 27,535 | 4,502 | 5,047 | 5,148 | 26,011 | 1,003,694² | |
| 1Includes $494,611 for new work on previous
projects. In addition $25,000 for new work was expended from contributed funds. ²Includes $100,830 for maintenance from previous projects | ||||||
9. NAVIGATION PROJECTS ON WHICH RECONNAISSANCE AND CONDITION SURVEYS ONLY WERE CONDUCTED DURING THE FISCAL YEAR
| Name of Project | Cost during fiscal year |
Date reconnaissance or condition survey conducted |
|---|---|---|
| Snake River ChannelLewiston to Johnson Bar Landing | $1,551 | Sept. 1961 |
10. OTHER AUTHORIZED NAVIGATION PROJECTS
| Name of project | For last full Report see Annual Report for | Cost to June 30, 1962 | Estimated amount required to Complete | |
|---|---|---|---|---|
| Construction | Operation and Maintenance | |||
| Umatilla Harbor | 1952 | | | $678,000¹ |
| 1No funds appropriated for work. Inactive. | ||||
11. COLUMBIA RIVER BASIN, LOCAL FLOOD-PROTECTION PROECTS
| Project | Federal Cost | Status June 30, 1962 | |
|---|---|---|---|
| Appropriated | Cost | ||
| Teton River, Idaho (not justified) | $10,387 | $10,387 | |
| Heise-Roberts Extension, Idaho | $1,780,000 | 40,677 | 40,677 |
| Mud Lake Area, Idaho (not justified) | 5,996 | 5,996 | |
| Shelley Area, Snake River, Idaho¹ | 32,335 | 32,335 | 32,335 |
| Blackfoot Area, Snake River, Idaho¹ | 42,796 | 42,796 | 42,796 |
| Blackfoot River, Idaho² | 398,000 | 102,174 | 101,587 |
| Portneuf River and Marsh Creek, Idaho¹ | 1,420,000 | 103,476 | 103,476 |
| Little Wood River, Idaho (Carey)¹ | 64,000 | 21,334 | 21,334 |
| Camas Creek, Idaho (not justified) | 10,680 | 10,680 | |
| Boise Valley, Idaho (Ada County unit) | 504,000 | 58,800 | 43,805 |
| Malheur River, Oregon (Vale Unit)¹ | 341,280 | 341,280 | 341,280 |
| Payette Valley, Idaho (not justified) | 23,178 | 23,178 | |
| Weiser River, Idaho¹ | 531,000 | 94,427 | 94,427 |
| Whitebird Creek, Idaho³ | 1,896 | 1,896 | |
| Grande Ronde Valley, Oregon¹ | 8,670,000 | 133,458 | 133,458 |
| South Fork Clearwater River, Idaho³ | 3,899 | 3,899 | |
| Kendrick, Potlatch River, Idaho¹ | 59,641 | 59,641 | |
| Palouse River, Washington | 737,000 | 1,600 | 1,600 |
| Mill Creek, Washington (not justified) | 3,537 | 3,537 | |
| Touchet River, Washington (not justified) | 11,198 | 11,198 | |
| Lower Walla Walla River, Washington (not justified) | 4,000 | 4,000 | |
| Umatilla River, Oregon (Echo)¹ | 883,000 | 28,145 | 28,145 |
| John Day River Area, Oregon | 371,000 | 46,572 | 35,248 |
| Total | 1,181,786 | 1,154,880 | |
| 1Reported under "Other Authorized Flood
Control Projects." 2The economic justification of work proposed has been established in compliance with conditions set forth in the Flood Control Act of 1950. Reported in detail in an individual report. 3Construction of emergency work at this location has obviated the need for improvements. Note: This list does not include improvements in Portland and Seattle Districts. | |||
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year | 1958 | 1959 | 1960 | 1961 | 1962 | Total to June 30, 1962 |
| New Work | ||||||
| $5 | $42,741 | $34,163 | $22,300 | $12,000 | $163,620¹ | |
| 23,399 | 26,302 | 19,647 | 29,786 | 1,201 | 152,296¹ | |
| Other new work data: | ||||||
| $11,324 | ||||||
| 20,000 | ||||||
| 31,324 | ||||||
|
1Comprises the following projects: Teton River, Idaho; Heise-Roberts Extension, Idaho;
Mud Lake Area, Idaho; Camas Creek, Idaho; Payette Valley, Idaho; Whitebird Creek, Idaho; South Fork,
Clearwater River, Idaho; Palouse River, Wash.; Mill Creek, Wash.; Touchet River, Wash.; Walla Walla
River, Wash.; lower Walla Walla River, Wash.; and John Day River Area, Oreg. Includes $24,500
preauthorization studies for this group of projects.
Excludes projects reported under "Other Authorized Flood Control Projects:" Shelley Area, Snake River, Idaho; Blackfoot Area, Snake River, Idaho; Portneuf River and Marsh Creek, Idaho; Little Wood River (Carey), Idaho; Malheur River (Vale), Oreg.; Weiser River, Idaho; Grande Ronde Valley, Oreg.; Kendrick, Potlatch River, Idaho; and Umatilla River (Echo), Oreg. Excludes projects reported in detail in an individual report: Blackfoot River, Idaho; and Boise Valley, Idaho. Does not include amounts for improvements in Portland and Seattle Districts. | ||||||
12. JACKSON HOLE, SNAKE RIVER, WYO.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $56,000 | $320,000 | $665,000 | | $50,000 | $1,601,000¹ | |
| 417,977 | 276,960 | 708,937 | $3,703 | 27,872 | 1,574,327¹ | |
| Other new work data: | ||||||
| $26,673 | ||||||
| 430,000 | ||||||
| 456,673 | ||||||
| 479,000 | ||||||
| ¹Includes $12,000 preauthorization studies | ||||||
13. BLACKFOOT RIVER, COLUMBIA RIVER BASIN, IDAHO
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | $42,191 | $12,000 | $16,083 | $20,000 | $102,174¹ | |
| $815 | 22,956 | 2,558 | 34,161 | 30,018 | 101,587¹ | |
| Other new work data: | ||||||
| $586 | ||||||
| 295,826 | ||||||
| 296,412 | ||||||
| ¹Includes $1,900 preauthorization studies. | ||||||
14. LUCKY PEAK RESERVOIR, BOISE RIVER, IDAHO
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $70,000 | $288,500 | | $37,750 | $15,300 | $19,116,550¹ | |
| 370,927 | 384,197 | $55,639 | 111,298 | 10,881 | 19,110,963 | |
| Maintenance | ||||||
| 80,600¹ | 73,400 | 72,800 | 77,480 | 91,500 | 526,540 | |
| 81,662 | 72,726 | 73,669 | 77,416 | 90,465 | 525,304 | |
| Other new work data: | ||||||
| $5,587 | ||||||
| 66,000 | ||||||
| 71,587 | ||||||
| 242,700 | ||||||
| ¹Includes $35,300 allotted under Code 710, recreation facilities on completed projects. | ||||||
15. BOISE VALLEY, COLUMBIA RIVER BASIN, IDAHO
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962¹ | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | $24,000 | $39,800 | | $40,000 | $58,800 | |
| $4,702 | 1,583 | 3,244 | $2,233 | 3,061 | 43,805 | |
| Other new work data: | ||||||
| $14,995 | ||||||
| 21,000 | ||||||
| 35,995 | ||||||
| 424,200 | ||||||
| ¹Includes $25,000 preauthorization studies. | ||||||
16. BRUCES EDDY DAM AND RESERVOIR, NORTH FORK CLEARWATER RIVER, IDAHO
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | $630,000 | $741,000 | $600,000 | $700,000 | $2,671,000 | |
| | 570,956 | 662,978 | 557,167 | 586,199 | 2,377,301 | |
| Other new work data: | ||||||
| $215,212 | ||||||
| 215,212 | ||||||
| 2 | ||||||
| ¹Includes $130,000 preauthorization
studies. ²Project authorized for planning only. | ||||||
17. COLFAX, PALOUSE RIVER, WASHINGTON
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| $136,000 | | $28,300 | $320,556 | $350,000 | $959,507 | |
| 19,516 | $51,849 | 88,524 | 100,359 | 130,589 | 508,819 | |
| Other new work data: | ||||||
| $436,977 | ||||||
| 1,100,000 | ||||||
| 1,536,977 | ||||||
| 2,320,493 | ||||||
| ¹Includes $3,800 preauthorization studies. | ||||||
18. DAYTON, TOUCHET RIVER, WASHINGTON
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | | | $30,377 | $5,000 | $55,741 | |
| | | | 18,656 | 9,461 | 48,481 | |
| Other new work data: | ||||||
| $7,250 | ||||||
| 21,000 | ||||||
| 28,260 | ||||||
| 263,259 | ||||||
| ¹Includes $4,300 preauthorization studies. | ||||||
19. MILL CREEK, WASH.
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| New Work | ||||||
| | | | $33,000 | $3,524 | $2,198,679¹ | |
| | | | 3,047 | 7,713 | 2,172,915¹ | |
| Maintenance | ||||||
| $18,900 | $20,100 | 23,470 | 23,020 | 22,000 | 691,470 | |
| 18,828 | 20,341 | 23,484 | 23,073 | 21,854 | 691,295 | |
| $25,764 | ||||||
| $10,000 | ||||||
| 35,764 | ||||||
| $163,476 | ||||||
| ¹In addition, $80,000 was expended for new work from
contributed funds. ²Includes $36,524 allotted under code 710, recreation facilities on completed projects. | ||||||
20. OTHER AUTHORIZED FLOOD CONTROL PROJECTS
| Name of project | For last full Report see Annual Report for | Cost and expenditures to June 30, 1962 | Estimated amount required to complete | |
|---|---|---|---|---|
| Construction | Operation and Maintenance | |||
| Arlington, Alkali Canyon, Oreg.¹ ² | 1950³ | $20,1124 | | |
| Blackfoot Area, Snake River, Columbia River Basin, Ida. | 1958 | 42,796 | | (5) |
| Grande Ronde Valley, Columbia River Basin, Oreg.6 | 1958 | 133,458 | $8,536,542 | 8,670,000 (1960) |
| Heise-Roberts Area, Snake River, Idaho | 1955 | 1,575,838 | | (5) |
| Kendrick, Potlatch River, Columbia River Basin, Idaho | 1960 | 59,941 | | (5) |
| Lewiston-Clarkston Levees7 | 1950 | | | |
| Little Wood River (Carey), Columbia River Basin, Idaho² | 1960 | 21,334 | 42,666 | 64,000 (1958) |
| Malheur Improvement Dist., Snake River, Oreg. | 1957 | 55,894 | | (5) |
| Malheur River, Columbia River Basin, Oreg., Vale Unit | 1961 | 341,280 | | (5) |
| Malheur River, Columbia River Basin, Oreg., Willow Creek Unit² | 1961 | | 269,000 | 269,000 (1959) |
| Milton-Freewater, Walla Walla River, Oreg. | 1956 | 886,956 | | (5) |
| Pendleton, Umatilla River, Oreg. (Flood Control works at Pendleton, Oreg.PL 738, 74th Cong., June 22, 1936) | 1939 | 143,263 | | (5) |
| Pendleton, Umatilla River, Oreg., State Hospital and city areas (local flood protection project at Pendleton, Oreg.,PL 738, 74th Cong., June 22, 1936) | 1960 | 276,848 | | (5) |
| Pendleton, Umatilla River, Oreg., Riverside area unit (local flood protection project at Pendleton, Oreg.,PL 516, 81st Cong., May 17, 1950)6 | 1960 | | 356,000 | 356,000 (1956) |
| Pilot Rock, Birch Creek, Oreg.8 | 1949 | 7,800 | 373,200 | 381,000 (1962) |
| Portneuf River and Marsh Creek, Columbia River Basin, Idaho | 1958 | 103,476 | 1,316,524 | 1,420,000 (1960) |
| Pullman, Palouse River, Washington8 | 1953 | 53,067 | 2,096,933 | 2,150,000 (1962) |
| Shelley Area, Snake River, Columbia River Basin, Idaho | 1958 | 32,335 | | (5) |
| Umatilla River (Echo), Columbia River Basin, Oreg.7 | 1960 | 28,145 | 854,855 | 883,000 (1959) |
| Weiser River, Columbia River Basin Idaho9 | 1960 | 94,427 | 436,573 | 531,000 (1962) |
|
1Protection to be provided in connection with John Day Lock and Dam, Columbia River, Wash. and
Oreg. 2Inactive. 3Reported by Portland District prior to 1951. 4In addition, $3,328 was spent in fiscal year 1960 under authorization of Public Law 685, 84th Congress. See Annual Report for fiscal year 1960, page 1887. 5Completed. 6Deferred for restudy. 7Withdrawn as a local flood protection project, June 1959. To be included as a feature of Lower Granite Lock and Dam, Snake River, Idaho and Wash.) 8Awaiting funds for further study. 9Awaiting local sponsorship. | ||||
21. INSPECTION OF COMPLETED FLOOD CONTROL WORKS
| River Basins | Inspections | |||
|---|---|---|---|---|
| Little Wood | 2 | |||
| Potlatch | 1 | |||
| Malheur | 1 | |||
| Salmon | 2 | |||
| Snake | 5 | |||
| Umatilla | 2 | |||
| Walla Walla | 3 | |||
| Cost and Financial Summary | ||||||
|---|---|---|---|---|---|---|
| Fiscal year ending June 30 | Total to June 30, 1962 | |||||
| 1958 | 1959 | 1960 | 1961 | 1962 | ||
| Maintenance: | ||||||
| $6,200 | $10,000 | $7,250 | $4,000 | $4,900 | $41,150 | |
| 6,101 | 10,097 | 7,195 | 3,955 | 5,000 | 41,148 | |
22. FLOOD CONTROL WORK UNDER SPECIAL AUTHORIZATION
| Project | Location | Date authorized |
Date of construction start |
Date completed |
Federal cost¹ |
|---|---|---|---|---|---|
| McKay Creek, tributary of Umatilla River | Pendleton, Oreg. | June 26, 1958² | | | $105 |
| ¹Actual cost during fiscal year 1962. ²Cancelled. | |||||
| Project | Location | Date authorized |
Date of construction start |
Date completed |
Federal cost¹ |
|---|---|---|---|---|---|
| Lower Dry Creek, Tributary of Walla Walla River, Wash. | Lower Dry Creek, Wash. | July 20, 1956 | September 1960 | Oct. 1961 | $17,911² |
| Mission and Lapwai Creeks | Lapwai, Idaho | Feb. 15, 1960 | | | 2,424 |
| Yakima River | W. Richland, Wash. | Oct. 1, 1957 | | | 10,136 |
| Zintel Canyon | Kennewick, Wash. | Dec. 3, 1956 | | | 2,518 |
| Connell, Wash. | Connell, Wash. | Oct. 6, 1961 | | | 6,998 |
| Greasewood Creek | Helix, Oreg. | Apr. 8, 1960 | | | 316 |
| South Fork, Clearwater River | Idaho | Feb. 19, 1962 | | | 1,015 |
| ¹Actual cost during fiscal year 1962. ²Final payment of Union Pacific Railroad contract not yet made. | |||||
| Project | Location | Date authorized |
Date of construction start |
Date completed |
Federal cost¹ |
|---|---|---|---|---|---|
| Advance preparation | Walla Walla District | Continuing | | | $8,970 |
| Flood fight | Portneuf River, Idaho | Feb. 12, 1962 | Feb. 1962 | Mar. 1962 | 97,036 |
| Wood River area, Idaho | do | do | do | ||
| Blackfoot River area, Idaho | do | do | do | ||
| Henry's Fork area, Teton River, Idaho | do | do | do | ||
| ¹Actual cost during fiscal year 1962. | |||||
23. SCHEDULING OF FLOOD CONTROL OPERATIONS
24. SURVEYS
| Location | Cost |
|---|---|
| Navigation Studies | |
| Snake River downstream from Weiser, Idaho | $8,1480 |
| Flood-Control Studies | |
| Upper Snake River above Weiser, Idaho | 30,007 |
| Mill Creek, Wash. | 219 |
| Willow Creek, Heppner, Oreg. | 11,310 |
| Touchet River, Wash. | 11,232 |
| Grande Ronde River, Oreg. | 21,644 |
| Walla Walla River, Wash. | 9,360 |
| Yakima River, Richland, Wash. | 41 |
| Boise River, Idaho | 8,741 |
| Cooperatives studiesSoil Conservation Service | 2,803 |
| Cooperative studiesBureau of Reclamation (Public Law 984-84) | 3,147 |
| Cooperative studiesBureau of Reclamation (other authorities) | 2,671 |
| Total flood-control studies | 101,175 |
| Flood-control studies | $240,000 |
| Cooperative studies with other agencies | 17,000 |
| 257,376 |
25. COLLECTION AND STUDY OF BASIC DATA
26. RESEARCH AND DEVELOPMENT