Annual Report of the Chief of Engineers
on Civil Works Activities
Fiscal Year 1986
Department of the Army Corps of Engineers
Extract Report of Walla Walla District
This District consists of all Columbia River drainage and tributaries thereto between the head of the McNary pool (River Mile 345.4) and Umatilla Bridge (river mile 290.5) below McNary Dam, except the Yakima River Basin above the Van Giesen Street Bridge (River Mile 8.4) near Richland, Washington.
Improvements
Navigation
| 1. | Navigation Work Under Special Authorization |
| 22. 23. 24. 25. |
Surveys Collection and Study of Basic Data Continuation of Planning and Engineering Advance Engineering and Design |
| Table 39-A Table 39-B Table 39-C Table 39-D Table 39-E Table 39-F Table 39-G Table 39-H Table 39-I Table 39-J Table 39-K |
Cost and Financial Statement Authorizing Legislation Other Authorized Navigation Projects Not Applicable Other Authorized Flood Control Projects Not Applicable Deauthorized Projects Columbia River Basin, Local Flood Control Projects Inspection of Completed Flood Control Projects Principal Data Concerning Navigation Lock, Spillway Dam, Powerplant, and Impoundment Snake River Downstream from Johnson Bar Landing, Oregon, Washington, and Idaho |