Annual Report of the Chief of Engineers
on Civil Works Activities
Fiscal Year 1990
Department of the Army Corps of Engineers
Extract Report of Walla Walla District
Improvements
Navigation
| 1. | Navigation Work Under Special Authorization |
| 24. 25. 26. |
Surveys Collection and Study of Basic Data Preconstruction, Engineering, and Design |
| Table 39-A Table 39-B Table 39-C Table 39-D Table 39-E Table 39-F Table 39-G Table 39-H Table 39-I Table 39-J Table 39-K |
Cost and Financial Statement Authorizing Legislation Other Authorized Navigation Projects Not Applicable Other Authorized Flood Control Projects Not Applicable Deauthorized Projects Columbia River Basin, Local Flood Control Projects Inspection of Completed Flood Control Projects Principal Data Concerning Navigation Lock, Spillway Dam, Powerplant, and Impoundment Snake River Downstream from Johnson Bar Landing, Oregon, Washington, and Idaho |