Little Goose Navigation Lock Gate Gudgeon Repair
The freshly painted, new gudgeon arm assembly is positioned along the navigation lock on April 15 for installation.

Download Image: Full Size (0.9 MB)
Tags: Little Goose
Photo by: U.S. Army Corps of Engineers |  VIRIN: 140415-A-CE999-703.JPG