Mill Creek Levee Maintenace
During phase-1 of maintenance on the Corps-managed portion of the Mill Creek Levee System, contractors will remove overgrown, encroaching vegetation from the surface of the levee slopes and 15-feet outward from the levee’s design toe.

Download Image: Full Size (0.91 MB)
Tags:
Photo by: Frank Wachob  |  VIRIN: 151009-A-CE999-524.JPG