construction of the ice harbor powerhouse
Construction on Ice Harbor Lock and Dam began in early 1956, and by 1961 the first generator unit was installed. It produced commercial power for the first time on December 18, 1961.

Download Image: Full Size (0.43 MB)
Tags:
Photo by: hannah mitchell |  VIRIN: 230410-A-QM295-0003.JPG