By 1962, Ice Harbor Lock and Dam had been built and construction of the second lower Snake River dam, Lower Monumental, was being passed to the US Army Corps of Engineers Seattle District. The third dam in the queue was right on the heels of Lower Monumental, but construction could not begin until the details of its downstream neighbor were determined.