US Army Corps of Engineers
Walla Walla District Website

News Releases by Month

September 2020 (1)
August 2020 (5)
July 2020 (9)
June 2020 (5)
May 2020 (6)
April 2020 (3)
March 2020 (9)
February 2020 (7)
January 2020 (2)
December 2019 (4)
November 2019 (5)
October 2019 (2)
September 2019 (5)
August 2019 (8)
July 2019 (13)
June 2019 (12)
May 2019 (21)
April 2019 (18)
March 2019 (8)
February 2019 (13)
January 2019 (6)
December 2018 (4)
November 2018 (5)
October 2018 (7)
September 2018 (15)
August 2018 (18)
July 2018 (15)
June 2018 (13)
May 2018 (14)
April 2018 (10)
March 2018 (10)
February 2018 (14)
January 2018 (4)
December 2017 (4)
November 2017 (8)
October 2017 (4)
September 2017 (10)
August 2017 (14)
July 2017 (5)
June 2017 (9)
May 2017 (15)
April 2017 (12)
March 2017 (26)
February 2017 (6)
January 2017 (12)
December 2016 (12)
November 2016 (6)
October 2016 (6)
September 2016 (8)
August 2016 (9)
July 2016 (8)
June 2016 (16)
May 2016 (10)
April 2016 (8)
March 2016 (7)
February 2016 (6)
January 2016 (1)
December 2015 (1)
November 2015 (5)
October 2015 (5)
September 2015 (12)
August 2015 (8)
July 2015 (6)
June 2015 (8)
May 2015 (5)
April 2015 (4)
March 2015 (9)
February 2015 (8)
January 2015 (7)
December 2014 (4)
November 2014 (11)
October 2014 (5)
September 2014 (12)
August 2014 (10)
July 2014 (9)
June 2014 (6)
May 2014 (12)
April 2014 (6)
March 2014 (10)
February 2014 (9)
January 2014 (3)
December 2013 (3)
November 2013 (4)
October 2013 (6)
September 2013 (7)
August 2013 (5)
July 2013 (8)
June 2013 (4)
May 2013 (13)
April 2013 (5)
March 2013 (8)
February 2013 (9)
January 2013 (5)
December 2012 (6)
November 2012 (8)
October 2012 (7)
September 2012 (8)
August 2012 (6)
July 2012 (8)
June 2012 (14)
May 2012 (16)
April 2012 (13)
March 2012 (12)
February 2012 (8)
January 2012 (3)
December 2011 (6)
November 2011 (7)
October 2011 (13)
September 2011 (14)
August 2011 (11)
July 2011 (11)
June 2011 (35)
May 2011 (21)
April 2011 (11)
March 2011 (9)
February 2011 (20)
January 2011 (7)

14-027 UPDATE #3: Little Goose navigation lock reopens; repair finished ahead of schedule

Published April 22, 2014

STARBUCK, Wash. – UPDATE #3 -- Inland commercial navigation between Lewiston, Idaho, and Portland, Ore., resumed at about 4:30 p.m. yesterday with the official reopening of the navigation lock at Little Goose Lock and Dam on the lower Snake River near Starbuck, Wash., U.S. Army Corps of Engineers officials announced.

The lock was kept out of service following the annual maintenance outage during March when cracks in the steel of a gudgeon arm assembly on the top of the lock’s downstream south gate leaf were tested and determined to be unsafe for continued operation. Initial emergency-repair schedules estimated a return to service by May 1. Corps project management officials at the Walla Walla District credit past timely maintenance decisions, favorable weather conditions, and exceptional teamwork between Corps and contractor staffs as key components to being able to reopen the lock nine days earlier than originally anticipated.

“First of all, we were fortunate that the developing cracks had already been identified last spring and fabrication of replacement parts had been ordered in September,” said Steve Hartman, Corps project manager. “If not for that critical maintenance decision, it could have taken anywhere from 3-4 months just to have the new pieces forged, machined and delivered under an emergency contract.”

If Little Goose lock had not reopened for 5 months, beginning in April 2014, it likely would have interfered with almost 1.5-million tons of commercial shipping. According to district navigation records from April 1 through Aug. 31, 2013 (5 months), 1,441,327 tons of cargo locked passed Little Goose Dam.

Several fish-research projects and the transportation program for juvenile salmon and steelhead would also have been impacted if the replacement gudgeon arm assembly parts had not already been ordered. The 2014 Federal Columbia River Power System Supplemental Biological Opinion (BiOp) fish transportation, which relies heavily upon barging, typically begins sometime between late-April and May 1. Corps fish managers coordinated with regional fishery experts to be prepared to address the needs of these programs through BiOp adaptive-management processes.

“The other key to repairing the gate so quickly was the way everyone worked so well together -- design and engineering experts, contracting specialists, maintenance staff, lock operators and the contractor’s staff,” said Hartman. “Everyone understood the urgency and had a whatever-it-takes attitude and commitment to repairing the gate as quickly as possible.”

The Corps awarded an emergency contract on April 1 to Knight Construction of Deer Park, Wash., to install the new gudgeon arm assembly. Contractor workers and Corps staff worked together seamlessly -- staying extended hours, running multiple shifts and performing tasks concurrently whenever possible to minimize the emergency outage period, said Hartman. “Other than an eight-hour timeframe of strong winds that prevented man basket use, favorable weather conditions really helped out, too.”  The Corps provided regular, sometimes daily, updates to commercial navigators, fish managers and other stakeholders, to help them be better able to plan their operations to align with the lock reopening. Commercial vessels bound for up- and down-stream destinations were lined up at Little Goose Lock and Dam for locking service hours as it reopened.

 Public Notices and other navigation lock information are available on the Walla Walla District website at www.nww.usace.army.mil/Missions/Navigation.aspx.

BACKGROUND: Little Goose Dam’s navigation lock has a downstream miter gate resembling a giant set of French doors. One gate leaf is about 118 feet tall, 43 feet wide and weighs 334 tons -- from 1986 through 2013, the gate performed 35,713 lockages. A gate gudgeon assembly is a key component of this style of gate, holding the gate into position at the top while the gate pivots to open and close (a hinge-like assembly). The steel gudgeon assembly is an original component of the lock and has not been removed since installation in the late-1960s.

 -30-


Contact
Public Affairs Office
509-527-7020
cenww-pa@usace.army.mil

Release no. 14-027