WALLA WALLA , Wash. – The U.S. Army Corps of Engineers, Walla Walla District, and its dredging contractor American Construction Company plan to begin lower Snake River dredging on or about Monday, Jan. 12, at the downstream lock approach of Ice Harbor Dam, plus at the confluence of the Snake-Clearwater rivers in the Lewiston-Clarkston area. Dredging vessels and equipment will also be moving between the dredging locations and the dredged material placement site (River Mile 116) during this time. The dredging is likely to involve a 24-hour-a-day operation. Starting Jan. 8, prior to the start of dredging, the contractor will be placing water quality monitoring buoys both downstream and upstream at the dredging locations.