EP 1110-1-8 Construction Equipment Ownership and Operating Expense Schedule

Engineering Pamphlet (EP) 1110-1-8 establishes predetermined equipment ownership and operating expense rates for construction equipment. It also establishes a method to calculate equipment ownership and operating expense rates for construction equipment when the predetermined rates are not considered appropriate. The overall intent of this pamphlet is to determine equipment costs that are fair and reasonable.

EP 1110-1-8 applies to all USACE Commands. The complete text of the EP 1110-1-8 is available at the Official Publications of the Headquarters website. The accompanying tables, factors, indices, lists, etc., are located below. Some information is the same for all regions and is located under “Information Common to All Regions.” Some information is region-specific and is listed below by Regions 1 through 12. See the map to the right and the maps under each region below for information on which geographic areas make up each region.

Current Rates

The following components are unique to each region, and can be found beneath each region's section below:

  • Hourly Equipment Ownership and Operating Expense (formerly Tables 2-1 and 2-2) (view the index here)
  • Equipment Age Adjustment Factors for Ownership Cost (formerly Table 3-1)
  • Equipment Age Adjustment Factors for Standby Cost (formerly Table 3-2)
  • Local Area Factors (Appendix B)
  • Example Calculations
All other information can be found in the Information Common to all Regions section.
Collapse All Expand All
Expand List item 36992Collapse List item 36992  Information Common to All Regions

The following components are applicable to all 12 geographic regions.

Expand List item 36993Collapse List item 36993  Region 1 - Northeast
Expand List item 36994Collapse List item 36994  Region 2 - Mideast
Expand List item 36995Collapse List item 36995  Region 3 - Southeast
Expand List item 36996Collapse List item 36996  Region 4 - North Central
Expand List item 36997Collapse List item 36997  Region 5 - Midwest
Expand List item 36998Collapse List item 36998  Region 6 - Southwest
Expand List item 36999Collapse List item 36999  Region 7 - West
Expand List item 37000Collapse List item 37000  Region 8 - Northwest
Expand List item 37001Collapse List item 37001  Region 9 - Alaska
Expand List item 37002Collapse List item 37002  Region 10 - Hawaii
Expand List item 37003Collapse List item 37003  Region 11 - Puerto Rico
Expand List item 37004Collapse List item 37004  Region 12 - Kwajalein      

  

Historical Rates

Past editions of the US Army Corps of Engineers EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, are available from 1981 to the present. If a year is not listed as a selection, then the pamphlet was not published in that year. To view a copy in PDF format, please select the required year and region.